5 - 4
ENG
ENGINE REMOVAL
Order
Job name/Part name
Q’ty
Remarks
4
Coupler
5
Disconnect.
5
Speed sensor/O-ring
1/1
6
Neutral switch lead/reverse switch lead
1/1
7
Ground lead
1
8
Clutch cable
1
9
Parking brake cable
1
10
Reverse control cable
1
11
Oil pipe 2
1
Disconnect.
12
Oil pipe 1
1
Disconnect.
13
Oil tank breather hose
1
Disconnect.
14
Crankcase breather hose
1
Disconnect.
For installation, reverse the removal pro-
cedure.
Содержание YFM660RN
Страница 1: ...YFM660RN YFM660RNC SERVICEMANUAL LIT 11616 14 21 5LP 28197 E0 ...
Страница 33: ...2 11 SPEC Cylinder head tightening sequence Item Standard Limit MAINTENANCE SPECIFICATIONS ...
Страница 45: ...2 23 SPEC OIL FLOW DIAGRAMS 1 Oil tank 2 Oil pipe 2 3 Oil pipe 1 OIL FLOW DIAGRAMS ...
Страница 46: ...2 24 SPEC 1 Oil delivery pipe 2 2 Oil delivery pipe 1 3 Oil filter 4 Crankshaft 5 Oil pump OIL FLOW DIAGRAMS ...
Страница 110: ...3 54 CHK ADJ CHECKING THE BATTERY Charging method using a variable voltage charger ...
Страница 111: ...3 55 CHK ADJ CHECKING THE BATTERY Charging method using a constant voltage charger ...
Страница 300: ...8 19 ELEC CHARGING SYSTEM EB804000 CHARGING SYSTEM CIRCUIT DIAGRAM 1 AC magneto 2 Rectifier regulator 4 Battery 5 Fuse ...
Страница 327: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN PRINTED IN U S A ...