3-23
CHECKING THE EXHAUST SYSTEM
CHK
ADJ
EAS00100
CHECKING THE EXHAUST SYSTEM
The following procedure applies to all of the ex-
haust pipe, muffler and gaskets.
1. Check:
S
exhaust pipe
1
S
muffler
2
Cracks / damage
Replace.
S
gaskets
3
New
Exhaust gas leaks
Replace.
2. Check:
S
tightening torque
Exhaust pipe nut
4
10 Nm (1.0 m
S
kg)
Exhaust pipe and muffler bolt
5
10 Nm (1.0 m
S
kg)
Muffler and muffler bracket bolt
6
25 Nm (2.5 m
S
kg)
Front exhaust pipe and muffler
7
12 Nm (1.2 m
S
kg)
Содержание XVS250 2001
Страница 1: ......
Страница 2: ......
Страница 8: ......
Страница 9: ......
Страница 11: ...GEN INFO ...
Страница 19: ......
Страница 20: ......
Страница 22: ...SPEC ...
Страница 39: ...2 17 MAINTENANCE SPECIFICATIONS SPEC Cylinder head tightening sequence Crankcase tightening sequence ...
Страница 45: ...2 23 ENGINE OIL FLOW DIAGRAMS SPEC EB205000 ENGINE OIL FLOW DIAGRAMS ...
Страница 46: ...2 24 ENGINE OIL FLOW DIAGRAMS SPEC ...
Страница 47: ...2 25 ENGINE OIL FLOW DIAGRAMS SPEC ...
Страница 56: ......
Страница 57: ......
Страница 108: ......
Страница 178: ......
Страница 179: ......
Страница 250: ......
Страница 252: ...CARB ...
Страница 267: ...6 15 A From air cleaner B To reed valve AIR INDUCTION SYSTEM CARB EAS00508 ...
Страница 274: ......
Страница 275: ......
Страница 277: ...ELEC ...
Страница 300: ...7 23 1 A C magneto 2 Rectifier regulator 4 Fuse main 6 Battery CHARGING SYSTEM ELEC CHARGING SYSTEM CIRCUIT DIAGRAM ...
Страница 308: ...7 31 SIGNALING SYSTEM ELEC SIGNALING SYSTEM CIRCUIT DIAGRAM ...
Страница 321: ......
Страница 322: ......
Страница 324: ...TRBL SHTG ...
Страница 330: ......