
PERIODIC MAINTENANCE AND MINOR REPAIR
6-7
6
To install the cowling
1. Connect the headlight coupler,
and the auxiliary light lead coupler.
2. Place the cowling in the original
position, and then install the
screws.
EAU19281
Panel A
To remove the panel
Remove the screw, and then pull the
panel off as shown.
To install the panel
Place the panel in the original position,
and then install the screw.
EAU45450
Panel B
To remove the panel
1. Pull up the floorboard mat.
2. Remove the screws, and then pull
the panel off as shown.
To install the panel
1. Place the panel in the original posi-
tion, and then install the screws.
2. Place the floorboard mat in the
original position.
1. Headlight coupler
2. Auxiliary light lead coupler
1
2
1. Screw
1
1. Floorboard mat
1. Screw
1
1
U4P7E1E0.book Page 7 Wednesday, December 12, 2007 9:37 AM
Содержание VITY XC125E
Страница 1: ...4P7 F8199 E1 XC125E OWNER S MANUAL ...
Страница 2: ...U4P7E1E0 book Page 2 Wednesday December 12 2007 9 37 AM ...
Страница 71: ...SPECIFICATIONS 8 3 8 Fuses Main fuse 15 0 A U4P7E1E0 book Page 3 Wednesday December 12 2007 9 37 AM ...
Страница 75: ...U4P7E1E0 book Page 2 Wednesday December 12 2007 9 37 AM ...
Страница 76: ...YAMAHA MOTOR CO LTD PRINTED IN CHINA 2007 12 0 3 1 CR E ...