–10–
O Make sure to insert the rectifier
regulator coupler sufficiently un-
til the sound is heard.
P To rear brake.
Q Fasten the rear brake switch
lead with a band to down tube.
(four point)
R Cutting part at the edge of the
band.
S 30
_
X
45
_
CABLE ROUTING
SPEC
J Fasten the wire harness, starter
motor positive (+) lead and bat-
tery negative (–) lead to the
frame with a plastic locking tie.
K 70 mm (2.76 in)
L Fasten the rear brake switch lead
and master cylinder reservoir
hose to the down tube with a plas-
tic locking tie, and cut the end of
locking tie and position is inside of
frame.
M 20 mm (0.79 in) (from bead end.)
N Locate the band to forward of
down tube.
E Connect the purge hose (carbu-
retor side-solenoid valve side)
with joint, knob is out side of frame.
F Route the front turn signal / posi-
tion light lead and headlight lead
through the rear of headlight
body hole.
G Connect the ignition coil lead at
red tape to the right side.
H Knob of clip is rearside of body.
I Fasten the rear brake switch
lead to the rear brake switch
bracket with a plastic locking tie
and cut of the end, inside of frame.
Содержание V-Star XVS1100AWR
Страница 1: ......
Страница 38: ...PRINTED IN U S A ...