5-11
ENG
INSTALLATION
1. Install:
• Muffler damper holder (temporarily)
2. Install:
• Exhaust pipe/muffler assembly
NOTE:
Position the exhaust pipe bolt
1
at the rear of the
hole
a
in the seat rail assembly, and then finger
tighten it.
È
Forward
a
1
È
3. Install:
• Exhaust pipe band
1
4. Tighten:
• Exhaust pipe bolt
5. Tighten:
• Muffler damper holder bolts
T
R
.
.
Exhaust pipe band bolt:
18 Nm (1.8 m · kg, 13 ft · lb)
T
R
.
.
Exhaust pipe bolt:
33 Nm (3.3 m · kg, 24 ft · lb)
T
R
.
.
Muffler damper holder bolt:
10 Nm (1.0 m · kg, 7.2 ft · lb)
1
Содержание PZ50W
Страница 260: ...6 13 COOL ...
Страница 294: ...7 34 FI ...
Страница 343: ...8 49 ELEC ...
Страница 381: ...9 28 SPEC GENERAL TORQUE SPECIFICATIONS DEFINITION OF UNITS ...
Страница 382: ...9 29 SPEC CABLE ROUTING E F G H I J K 6 8 7 0 A B 9 C D 1 2 3 4 5 L M N O P Q R S T U V W Y X Z ...
Страница 384: ...9 31 SPEC CABLE ROUTING E F G H I J K 6 8 7 0 A B 9 C D 1 2 3 4 5 L M N O P Q R S T U V W Y X Z ...
Страница 386: ...9 33 SPEC CABLE ROUTING E F G H I J K 8 9 0 A B C D 1 2 3 4 5 6 7 L M N O P Q R S T U V W X Y Z ...
Страница 388: ...9 35 SPEC CABLE ROUTING E F G H I J K 8 9 0 A B C D 1 2 3 4 5 6 7 L M N O P Q R S T U V W X Y Z ...
Страница 390: ...9 37 SPEC CABLE ROUTING A E H I J K L M 7 9 8 0 A B C D 1 2 3 4 5 6 N G F A W X Y Z O P Q R S T U V ...
Страница 392: ...9 39 SPEC A E H I J K L M 7 9 8 0 A B C D 1 2 3 4 5 6 N G F A W X Y Z O P Q R S T U V CABLE ROUTING ...
Страница 394: ...9 41 SPEC CABLE ROUTING A B E E F G H I J K 8 8 9 9 9 0 0 0 A A A B B C C D 1 1 2 2 3 3 3 4 5 6 6 7 L M N O P Q R S A B ...
Страница 396: ...9 43 SPEC CABLE ROUTING A B E E F G H I J K 8 8 9 9 9 0 0 0 A A A B B C C D 1 1 2 2 3 3 3 4 5 6 6 7 L M N O P Q R S A B ...
Страница 416: ...9 63 SPEC CABLE ROUTING 1 2 3 4 5 6 ...
Страница 418: ...9 65 SPEC CABLE ROUTING 8 9 1 2 3 4 4 5 6 7 PZ50 PZ50GT PZ50FX PZ50M PZ50VT PZ50MP ...