E-
12
3
Install the ceiling bracket on the ceiling.
First hand-tighten the four nuts, determine the position, and then tighten the nuts securely.
(PMT-L21)
(PMT-H25)
Caution
•
Use M8 bolts (commercially available) to install the ceiling bracket. Using any bolts other than M8 bolts could
cause the projector to fall.
Note to Dealers and Installers
For the customer’s safety, make sure that the location where the projector is to be installed is strong
enough to bear the weight of the projector, the ceiling bracket, and the other hardware before
installing the ceiling bracket.
4
Hang the projector from the ceiling bracket.
Slide the mounting guide pin all of the way into the notch on the projector mounting adapter. This pin is
only meant to support the projector temporarily, and does not hold the projector securely. Be careful that
the projector does not fall.
(PMT-L21)
Mounting guide pin
Projector mounting adapter
Pr
ojection
direction
Pr
ojection
direction