3-4
CHAS
1
2
a
a
STEERING
INSTALLATION
1. Install:
•
Bushings
1
NOTE:
Mount the bushing with clearance
a
to the end of
the relay arm
2
.
a
Approx. 1 mm (0.04 in)
2. Install:
•
Tie rods
1
NOTE:
•
Make sure that the indentation
a
on the tie rod
faces out.
•
The threads on both rod ends must be the same
length.
CAUTION:
Always use new cotter pins.
Locknut (rod end):
25 Nm (2.5 m • kg, 18 ft • lb)
LOCTITE
®
Nut (tie-rod-relay arm):
35 Nm (3.5 m • kg, 25 ft • lb)
Nut (tie-rod-steering arm):
42 Nm (4.2 m • kg, 30 ft • lb)
3. Install:
•
Relay rod
1
NOTE:
Make sure that the end of the relay rod with the
indentation
a
is connected to the relay arm.
CAUTION:
Always use new cotter pins.
Nut (relay rod):
35 Nm (3.5 m • kg, 25 ft • lb)
T
R
.
.
T
R
.
.
SEJ3080
SEJ3090
SEJ3100
SEJ3075
Содержание MM600D
Страница 1: ...MM600D MM700D SERVICE MANUAL LIT 12618 02 12 8EJ 28197 10 981033 ...
Страница 47: ...2 34 INSP ADJ CARBURETOR TUNING Guide for carburetion SEJ2750 ...
Страница 197: ...SPEC 9 19 CABLE ROUTING SEJ9140 N M A L K J I H 30 G F E D C B A 0 9 8 7 6 5 4 3 2 1 P D C O B B 45 B B A O D C Q ...
Страница 199: ...SPEC 9 21 CABLE ROUTING SEJ9150 N M A L K J I H 30 G F E D C B A 0 9 8 7 6 5 4 3 2 1 P D C O B B 45 B B A O D C Q ...
Страница 201: ...SPEC 9 23 CABLE ROUTING SEJ9160 ...
Страница 203: ...SPEC 9 25 CABLE ROUTING SEJ9170 ...
Страница 205: ...SPEC 9 27 CABLE ROUTING SEJ9180 ...
Страница 207: ...SPEC 9 29 CABLE ROUTING SEJ9190 ...
Страница 209: ...SPEC 9 31 CABLE ROUTING SEJ9200 ...
Страница 213: ...PRINTED ON RECYCLED PAPER 99 06 1 E CR ...