– 18 –
SPEC
CABLE ROUTING
Ï
Fasten the joint coupler lead and horn switch
lead (for Europe and Oceania) with the clamp.
Ð
Pass the coolant reservoir breather hose
through the guides on the plastic cover and elec-
trical components tray and route it under the
positive battery lead and starter motor lead.
Ñ
Route the hoses under the positive battery lead,
and then route them upward, to the inside of the
coolant reservoir breather hose.
Ò
Fasten the coolant reservoir breather hose with
the holder on the electrical components tray.
Ó
Fasten the coolant reservoir hose with the
holder on the electrical components tray.
Ô
Pass the hoses, ground lead, and horn switch
lead through the opening in the electrical com-
ponents tray.
Õ
Route the coolant reservoir breather hose above
the other hoses.
Ö
Route the hoses to the inside of the bolt.
×
YFM7FGPX
Ø
YFM7FGX
O
C
C
A
A
D
D
E
E
C-C
D-D
A-A
G-G
È
Ô
Ó
Ñ
Ò
Ð
Í
Ì
É
Ë
Ê
É
M
L
K
E
D
C
6
A
B
0
9
D
7
5
6
3
8
H
I
J
3
4
5
O
P
Õ
Ï Î
Ö
E
I
2
L
M
1
35
N
K
1
2
G
B
G
O
2
P
B
F
F
E-E
P
B-B
P
×
4
G
F
Ø
Ø
Q
F
F
P
6
×
6
Q
F-F
F-F
E-E
– 17 –