8-13
8
2. Install the front carrier by installing the bolts
and tightening them to the specified torques.
3. Install panel A.
Panel C
To remove the panel
1. Remove the seat. (See page 4-18.)
2. Remove the quick fastener screws, and then
pull the panel upward to remove it.
To install the panel
1. Place the panel in the original position, and
then install the quick fastener screws.
Tightening torques:
Carrier bolt (upper):
34 Nm (3.4 m·kgf, 25 ft·lbf)
Carrier bolt (lower):
34 Nm (3.4 m·kgf, 25 ft·lbf)
Carrier bolt (under the fenders):
7 Nm (0.7 m·kgf, 5.1 ft·lbf)
1. Panel C
2. Quick fastener screw
U2LB10E0.book Page 13 Thursday, March 7, 2013 4:13 PM
Содержание GRIZZLY 550 2013
Страница 62: ...7 1 7 EBU21132 RIDING YOUR ATV U2LB10E0 book Page 1 Thursday March 7 2013 4 13 PM...
Страница 163: ...11 3 11 1 Vehicle Emission Control Information label 1 U2LB10E0 book Page 3 Thursday March 7 2013 4 13 PM...
Страница 172: ...U2LB10E0 book Page 3 Thursday March 7 2013 4 13 PM...
Страница 175: ......
Страница 176: ......