8-37
8
19. When coolant begins to flow out of the bolt
hole, tighten the cylinder head air bleed bolt to
the specified torque.
20. Start the engine and let it idle for ten minutes.
21. Rev the engine five times.
22. Pour the recommended coolant into the radia-
tor until it is full.
23. Stop the engine and allow it to cool. If the cool-
ant level has dropped after the engine has
cooled, add sufficient coolant until it reaches
the top of the radiator, and then install the ra-
diator cap.
24. Start the engine, and then check for coolant
leakage.
TIP
If any leakage is found, have a Yamaha dealer
check the cooling system.
25. Install the V-belt cooling duct, and then tighten
the clamp screw.
26. Install the footboard by installing the bolts and
nuts, and then tighten them to the specified
torques.
1. Cylinder head air bleed bolt
Tightening torque:
Cylinder head air bleed bolt:
10 Nm (1.0 m·kgf, 7.2 ft·lbf)
U2LB10E0.book Page 37 Thursday, March 7, 2013 4:13 PM
Содержание GRIZZLY 550 2013
Страница 62: ...7 1 7 EBU21132 RIDING YOUR ATV U2LB10E0 book Page 1 Thursday March 7 2013 4 13 PM...
Страница 163: ...11 3 11 1 Vehicle Emission Control Information label 1 U2LB10E0 book Page 3 Thursday March 7 2013 4 13 PM...
Страница 172: ...U2LB10E0 book Page 3 Thursday March 7 2013 4 13 PM...
Страница 175: ......
Страница 176: ......