PERIODIC MAINTENANCE
3-5
9. Connect:
●
Spark plug caps
10.Install:
●
Rubber cover
Refer to “AIR INDUCTION SYSTEM” on
page 7-11.
●
Air filter case
Refer to “GENERAL CHASSIS” on page 4-1.
●
Fuel tank
Refer to “FUEL TANK” on page 7-1.
●
Passenger seat/Rider seat
Refer to “GENERAL CHASSIS” on page 4-1.
EAS20490
ADJUSTING THE VALVE CLEARANCE
The following procedure applies to all of the
valves.
TIP
●
Valve clearance adjustment should be made
on a cold engine, at room temperature.
●
When the valve clearance is to be measured or
adjusted, the piston must be at top dead center
(TDC) on the compression stroke.
1. Remove:
●
Passenger seat/Rider seat
Refer to “GENERAL CHASSIS” on page 4-1.
●
Fuel tank
Refer to “FUEL TANK” on page 7-1.
●
Air filter case
Refer to “GENERAL CHASSIS” on page 4-1.
●
Throttle bodies
Refer to “THROTTLE BODIES” on page 7-4.
●
Air cut-off valve
●
Rubber cover
Refer to “AIR INDUCTION SYSTEM” on
page 7-11.
2. Remove:
●
Spark plug caps
●
Spark plugs
●
Throttle body
Refer to “THROTTLE BODIES” on page 7-4.
●
Cylinder head cover
●
Cylinder head cover gasket
Refer to “CAMSHAFTS” on page 5-8.
3. Remove:
●
Pickup rotor cover “1”
●
Gasket
4. Measure:
●
Valve clearance
Out of specification
→
Adjust.
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a. Turn the crankshaft counterclockwise.
b. When piston #1 is at TDC on the compres-
sion stroke, align the TDC mark “a” on the
pickup rotor with the crankcase mating sur-
face “b”.
TIP
TDC on the compression stroke can be found
when the camshaft lobes are turned away from
each other.
c. Measure the valve clearance with a thickness
gauge “1”.
TIP
●
If the valve clearance is incorrect, record the
measured reading.
●
Measure the valve clearance in the following
sequence.
Valve clearance (cold)
Intake
0.13
–
0.20 mm (0.0051
–
0.0079 in)
Exhaust
0.23
–
0.30 mm (0.0091
–
0.0118 in)
Valve clearance measuring sequence
Cylinder #1
→
→
→
→
#2
→
→
→
→
#4
→
→
→
→
#3
Содержание FZ6RC
Страница 1: ...SERVICE MANUAL FZ6RY C 2009 36P 28197 10 LIT 11616 22 77 ...
Страница 2: ......
Страница 8: ......
Страница 38: ...CHASSIS SPECIFICATIONS 2 11 Drive chain slack 45 0 55 0 mm 1 77 2 17 in 15 link length limit 239 3 mm 9 42 in ...
Страница 54: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27 EAS20410 LUBRICATION DIAGRAMS 1 5 3 2 4 ...
Страница 56: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 3 7 8 2 1 4 6 5 ...
Страница 58: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 3 6 5 1 2 4 ...
Страница 60: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 1 2 4 5 3 ...
Страница 62: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 3 2 5 4 1 ...
Страница 64: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 2 3 1 ...
Страница 65: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 38 1 Main axle 2 Drive axle 3 Oil pipe ...
Страница 66: ...COOLING SYSTEM DIAGRAMS 2 39 EAS20420 COOLING SYSTEM DIAGRAMS 1 1 2 2 3 5 6 4 4 7 ...
Страница 68: ...CABLE ROUTING 2 41 EAS20430 CABLE ROUTING ...
Страница 70: ...CABLE ROUTING 2 43 ...
Страница 72: ...CABLE ROUTING 2 45 ...
Страница 74: ...CABLE ROUTING 2 47 ...
Страница 76: ...CABLE ROUTING 2 49 ...
Страница 78: ...CABLE ROUTING 2 51 ...
Страница 80: ...CABLE ROUTING 2 53 ...
Страница 82: ...CABLE ROUTING 2 55 ...
Страница 84: ...CABLE ROUTING 2 57 ...
Страница 86: ...CABLE ROUTING 2 59 ...
Страница 88: ...CABLE ROUTING 2 61 ...
Страница 90: ...CABLE ROUTING 2 63 ...
Страница 92: ...CABLE ROUTING 2 65 ...
Страница 94: ...CABLE ROUTING 2 67 ...
Страница 96: ...CABLE ROUTING 2 69 ...
Страница 98: ...CABLE ROUTING 2 71 ...
Страница 100: ...ADJUSTING THE HEADLIGHT BEAMS 3 29 REPLACING THE HEADLIGHT BULBS 3 30 ...
Страница 196: ...CHAIN DRIVE 4 64 ...
Страница 244: ...OIL PUMP 5 46 1 2 ...
Страница 291: ...THERMOSTAT 6 8 Below the specified pressure Replace the radiator cap Refer to CHECKING THE RADIATOR on page 6 3 ...
Страница 308: ...AIR INDUCTION SYSTEM 7 11 EAS27040 AIR INDUCTION SYSTEM 1 2 3 4 5 2 3 6 ...
Страница 315: ......
Страница 316: ...IGNITION SYSTEM 8 1 EAS27090 IGNITION SYSTEM EAS27110 CIRCUIT DIAGRAM ...
Страница 320: ...ELECTRIC STARTING SYSTEM 8 5 EAS27160 ELECTRIC STARTING SYSTEM EAS27170 CIRCUIT DIAGRAM ...
Страница 326: ...CHARGING SYSTEM 8 11 EAS27200 CHARGING SYSTEM EAS27210 CIRCUIT DIAGRAM ...
Страница 327: ...CHARGING SYSTEM 8 12 1 AC magneto 2 Rectifier regulator 3 Battery 4 Main fuse ...
Страница 329: ...CHARGING SYSTEM 8 14 ...
Страница 330: ...LIGHTING SYSTEM 8 15 EAS27240 LIGHTING SYSTEM EAS27250 CIRCUIT DIAGRAM ...
Страница 333: ...LIGHTING SYSTEM 8 18 ...
Страница 334: ...SIGNALING SYSTEM 8 19 EAS27270 SIGNALING SYSTEM EAS27280 CIRCUIT DIAGRAM ...
Страница 340: ...COOLING SYSTEM 8 25 EAS27300 COOLING SYSTEM EAS27310 CIRCUIT DIAGRAM ...
Страница 343: ...COOLING SYSTEM 8 28 ...
Страница 344: ...FUEL INJECTION SYSTEM 8 29 EAS27330 FUEL INJECTION SYSTEM EAS27340 CIRCUIT DIAGRAM ...
Страница 382: ...FUEL PUMP SYSTEM 8 67 EAS27550 FUEL PUMP SYSTEM EAS27560 CIRCUIT DIAGRAM ...
Страница 385: ...FUEL PUMP SYSTEM 8 70 ...
Страница 386: ...ELECTRICAL COMPONENTS 8 71 EAS27970 ELECTRICAL COMPONENTS 2 1 3 4 5 6 10 8 9 11 7 12 13 14 15 ...
Страница 388: ...ELECTRICAL COMPONENTS 8 73 2 1 3 4 5 6 10 8 9 7 11 12 13 ...
Страница 390: ...ELECTRICAL COMPONENTS 8 75 EAS27980 CHECKING THE SWITCHES 7 8 9 12 11 14 10 4 1 2 3 5 6 13 ...
Страница 410: ...ELECTRICAL COMPONENTS 8 95 ...
Страница 417: ......
Страница 418: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...
Страница 419: ...FZ6RY C 2009 WIRING DIAGRAM XJ6N 2009 SCHÉMA DE CÂBLAGE FZ6RY C A W D 09 1 22 9 55 ページ 1 ...
Страница 420: ...FZ6RY C 2009 WIRING DIAGRAM XJ6N 2009 SCHÉMA DE CÂBLAGE FZ6RY C A W D 09 1 22 9 55 ページ 2 ...