5-64
E
POWR
CYLINDER HEAD
EXPLODED DIAGRAM
Step
Procedure/Part name
Q’ty
Service points
4
Nut/washer
2/2
5
Nut/washer
6/6
6
Nut/washer
2/2
7
Cylinder head
1
8
Cylinder head gasket
1
9
Dowel pin
2
Reverse the removal steps for installation.
E
E
E
E
E
E
2
4
1
8
5
5
7
9
3
5
5
6
LT
271
2nd 121
±
5˚
1st 20 N • m (2.0 kgf • m, 14 ft • Ib)
2nd 140
±
5˚
1st 20 N • m (2.0 kgf • m, 14 ft • Ib)
10 N • m (1.0 kgf • m, 7.2 ft • Ib)
6
×
12 mm
10 N • m (1.0 kgf • m, 7.2 ft • Ib)
6
×
55 mm
10 N • m (1.0 kgf • m, 7.2 ft • Ib)
6
×
12 mm
40 N • m (4.0 kgf • m, 29 ft • Ib)
8
×
20 mm
5
2nd 105
±
5˚
1st 20 N • m (2.0 kgf • m, 14 ft • Ib)
E
Not reusable