3-39
PISTON, CONNECTING ROD, CRANKSHAFT AND
CRANKCASE
SVU3670
SVU3680
1
1
1
2
CRANKSHAFT INSPECTION
1. Measure:
9
Crankshaft runout limit
use a dial gauge
Out of specification
→
Replace.
2. Inspect:
9
Crankshaft sprocket
1
Crack/damage/wear
→
Replace the
crankshaft.
3. Measure:
9
Crank pin outside diameter
Use a micrometer.
Out of specification
→
Replace.
CONNECTING ROD OIL CLEARANCE
INSPECTION
NOTE:
Measure the oil clearance if replacing the
crankshaft or connecting rod.
1. Place a piece of Plastigauge
1
on the
crank pin horizontally.
NOTE:
Clean off oil from all parts thoroughly.
2. Install:
9
Connecting rod
1
9
Connecting rod cap
2
NOTE:
Tighten the cap bolts so that the crankshaft
does not move while the oil clearance is being
measured.
ENG
Runout limit:
0.04 mm (0.0016 in)
Crank pin outside diameter:
28.0 mm (1.102 in)
Wear limit:
27.9 mm (1.098 in)
12 Nm (1.2 m · kg, 8.7 ft · lb)
7CF7E0-03 05.7.3 15:14 Page 39