7-16
WIRE ROUTING DIAGRAM
SPEC
1
2
3
4
5
6
7
8
8
∫
å
ç
∂
∂
9
1
Throttle control motor
2
Clamp
3
Choke cable
4
Choke knob
5
Starter handle
6
Control unit
7
Rectifier
8
Band
9
Noise filter (For GERMANY)
å
Put in completely the cable cap to the clamp.
∫
Be sure to fully-pushed position, when install the
choke cable to the carburetor.
ç
Pass through the starter rope into the front cover,
and then tie knot the rope end.
∂
Hook the mount latch.
7CF7E0-07 05.7.19 11:54 Page 16