Pre-operation checks
131
The steering and shifting pre-operation checks will require two persons: one person to oper-
ate the controls and one person to observe the proper operation at the stern.
POST-LAUNCH CHECKS
Switches
Check operation of the main switches and engine shut-
off switch.
Cooling water pilot outlets
Check that water comes out while the engines are run-
ning.
Fuel level
Check fuel level; add as necessary.
ITEM
CHECK
PAGE
SportsBoat_F3R13.book Page 131 Friday, May 31, 2019 9:42 AM
Downloaded from