CYLINDER HEAD
5-15
b. With the timing chain tensioner rod turned
all the way into the timing chain tensioner
housing (with the thin screwdriver still
installed), install the new gasket and the
timing chain tensioner “2” onto the body
cylinder.
c. Tighten the timing chain tensioner bolts “3”
to the specified torque.
d. Remove the screwdriver, make sure that
the timing chain tensioner rod releases,
and then tighten the cap bolt “4” to the
specified torque.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
6. Turn:
• Crankshaft
(several turns counterclockwise)
7. Check:
• “I” mark “a”
Align the “I” mark on the generator rotor
with the stationary pointer “b” on the
crankcase cover.
• “I” mark “c”
Align the “I” mark on the camshaft
sprocket with the stationary pointer “d” on
the cylinder head.
Out of alignment
→
Correct.
Refer to the installation steps above.
8. Tighten:
• Camshaft sprocket bolt
ECA13750
Be sure to tighten the camshaft sprocket
bolts to the specified torque to avoid the
possibility of the bolts coming loose and
damaging the engine.
9. Measure:
• Valve clearance
Out of specification
→
Adjust.
Refer to “ADJUSTING THE VALVE
CLEARANCE” on page 3-4.
Camshaft sprocket bolt
10 Nm (1.0 m·kg, 7.4 ft·lb)
Camshaft sprocket bolt
60 Nm (6.0 m·kg, 44 ft·lb)
Содержание 2009 Raptor 250
Страница 1: ...SERVICE MANUAL YFM25RY YFM25RSEY YFM25RSE2Y 4D3 28197 11 LIT 11616 22 09 2009 ...
Страница 8: ......
Страница 39: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 20 ...
Страница 42: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 23 EAS20410 LUBRICATION DIAGRAMS ...
Страница 43: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 24 1 Camshaft 2 Oil filter element 3 Oil pump 4 Oil strainer ...
Страница 44: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25 ...
Страница 46: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27 ...
Страница 47: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 28 1 Oil cooler 2 Oil hose 1 3 Oil hose 2 ...
Страница 48: ...CABLE ROUTING 2 29 EAS20430 CABLE ROUTING ...
Страница 50: ...CABLE ROUTING 2 31 ...
Страница 52: ...CABLE ROUTING 2 33 ...
Страница 54: ...CABLE ROUTING 2 35 ...
Страница 56: ...CABLE ROUTING 2 37 ...
Страница 58: ...CABLE ROUTING 2 39 ...
Страница 60: ...CABLE ROUTING 2 41 ...
Страница 62: ...CABLE ROUTING 2 43 ...
Страница 65: ......
Страница 143: ...HANDLEBAR 4 42 Throttle cable free play 2 0 4 0 mm 0 08 0 16 in ...
Страница 162: ...CHAIN DRIVE 4 61 ...
Страница 165: ......
Страница 240: ...CARBURETOR 6 9 ...
Страница 242: ...IGNITION SYSTEM 7 1 EAS27090 IGNITION SYSTEM EAS27100 CIRCUIT DIAGRAM ...
Страница 246: ...ELECTRIC STARTING SYSTEM 7 5 EAS27160 ELECTRIC STARTING SYSTEM EAS27170 CIRCUIT DIAGRAM ...
Страница 252: ...CHARGING SYSTEM 7 11 EAS27200 CHARGING SYSTEM EAS27210 CIRCUIT DIAGRAM ...
Страница 253: ...CHARGING SYSTEM 7 12 2 Stator coil 3 Rectifier regulator 5 Battery positive lead 6 Battery 7 Fuse 28 Ground ...
Страница 255: ...CHARGING SYSTEM 7 14 ...
Страница 256: ...LIGHTING SYSTEM 7 15 EAS27240 LIGHTING SYSTEM EAS27250 CIRCUIT DIAGRAM ...
Страница 260: ...SIGNALING SYSTEM 7 19 EAS27270 SIGNALING SYSTEM EAS27280 CIRCUIT DIAGRAM ...
Страница 264: ...CARBURETOR HEATING SYSTEM 7 23 EAS27490 CARBURETOR HEATING SYSTEM EAS27500 CIRCUIT DIAGRAM ...
Страница 267: ...CARBURETOR HEATING SYSTEM 7 26 ...
Страница 268: ...ELECTRICAL COMPONENTS 7 27 EAS27972 ELECTRICAL COMPONENTS ...
Страница 270: ...ELECTRICAL COMPONENTS 7 29 EAS27980 CHECKING THE SWITCHES ...
Страница 284: ...ELECTRICAL COMPONENTS 7 43 ...
Страница 291: ......
Страница 292: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...
Страница 293: ...WIRING DIAGRAM YFM25RY YFM25RSEY YFM25RSE2Y ...