2 - 48
SPEC
CABLE ROUTING
È
Install the rollover valve to canister hose with the
paint mark facing up.
É
Install the fuel tank to rollover valve hose with
the paint mark facing to the left.
Ê
Fasten the canister to throttle body hose with the
plastic holder between the stoppers on the hose.
Ë
Align the plastic clips with the paint marks on the
canister to throttle body hose.
Ì
Route the canister to throttle body hose through
the guide.
Í
Install the canister to throttle body hose and the
rollover valve to canister hose onto the canister,
making sure they contact the canister body.
Downloaded
from www.ScooterTime.net