1
1. Principles of operation
There are two diaphragms fixed to the center rod, one at each end. When compressed air is supplied to air
chamber b (right side, see Fig.1.1), the center rod moves to the right, the material in material chamber B is
pushed out, and at the same time material is sucked into material chamber A.
When the center rod is moved full-stroke to the right, the air switch valve is switched, compressed air is sent
to air chamber a (left side, see Fig.1.2), and the center rod moves to the left. The material in material
chamber A is pushed out, and at the same time material is sucked into material chamber B.
Through repetition of this operation, material is repeatedly taken in and discharged out.
2. Tools, etc.
2.1 General tools
·
Socket wrenches
10 mm
(
A_, S_, P_
)
, 12 mm
(
P_
)
,
13 mm
(
A_, S_
)
, 17 mm
(
A_, S_
)
·
Open-end wrenches
10 mm
(
A_, S_
)
, 12 mm
(
P_
)
, 13 mm
(
A_, S_
)
,
17 mm
(
A_, S_
)
, 22 mm
(
P_
)
·
Hexagonal box wrenches
5 mm
· Phillips head screw driver
(
P_
)
· Pliers
(
P_
)
2.2 Special tools (sold separately)
·
Cap and disk remover
(
A_, S_
)
·
Sleeve remover
Purpose: Removing the cap
Purpose: For removing sleeves
2.3 Misc.
· Assembly oil Turbine oil none addition class 1(equivalent ISO VG32 grade)
· Grease
Urea grease grade (NLGI) No.2
· Thread locking agent Equivalent to LOCTITE® 222
3. Ordering Replacement parts
For accurate and speedy shipment of parts, be sure to order the right parts for your model to distributor.
Indicate the part numbers, descriptions, and quantities.
Fig.1.1
Fig.1.2
Fig.2.1
Fig.2.2
(Part No. 771132)
(Part No. 713148)
Содержание Global Series
Страница 1: ...MAINTENANCE MANUAL G15 Series Doc No NDP 497M 02...
Страница 17: ......