![YAMADA 140 Series Скачать руководство пользователя страница 8](http://html.mh-extra.com/html/yamada/140-series/140-series_instruction_894484008.webp)
3
2. Installation
CAUTION
-
This unit rises up to a full height of 1850mm. Be sure to have enough space around the unit when
installing.
-
Be sure to turn each air regulator all the way to the left (counterclockwise) BEFORE connecting
hoses.
-
Keep yourself away from the lift when operating it. Do not touch any part of the unit other than the
control switches.
-
Do not put your hand or any other parts of your body between a drum and the inductor plate when
installing a drum. An unexpected body injury may be caused.
2.1 Lift installation
1
)
Install the lift in your work site. Make sure the environment satisfies the following conditions:
- A flat surface indoor (area where exhaust from the pump does not affect peripheral equipment)
- Enough space for up/down movement of the lift (full height of the lift: 1850mm)
- Enough space to perform maintenance
2
)
When using caster wheels:
Make sure the front caster wheel locks are both locked during pump operation (including lift operation). Keep the
caster wheels locked whenever machine is not being moved.
3
)
When anchoring the unit to the floor:
Remove all the caster wheels from the lift base. Using M12 anchor bolts, secure the unit to the floor that satisfies
the installation requirements above.
Fig. 3
Mounting dimensions for floor anchoring