Table of Contents
- Preface
- For Safe Operation
- Warnings and Cautions
- Precautions on Use
- Table of Contents
1. Part Names
1.1 Part names ········································································································ 1
1.2 Contents of a package ·························································································· 2
2. Installation
2.1 Lift installation ····································································································· 3
2.2 Discharge piping ································································································· 3
2.3 Air piping ··········································································································· 3
2.4 Pump installation ································································································· 4
2.5 Connecting the ground wire ················································································· 5
3. Operating Method
··································································································· 5
3.1 Description of control and valve ·············································································· 6
3.2 Placement of drum ······························································································ 7
3.3 Operation ·········································································································· 7
3.4 Replacement of drum ··························································································· 8
3.5 After work ·········································································································· 8
4. Maintenance and Inspection
4.1 Maintenance and inspection ···················································································· 9
4.2 Troubleshooting ·································································································· 11
4.3 Consumables ····································································································· 12
4.4 Design standard use period ··················································································· 12
5. Parts Disassembly Drawing and Parts List
····························································· 13
6. Specifications
6.1 Unit specifications ······························································································· 16
6.2 Pump specifications ····························································································· 16
6.3 Dimensions ········································································································ 16
7. Limited Warranty
···································································································· 17
Содержание 125 Series
Страница 18: ...13 5 Parts Disassembly Drawing and Parts List Parts Disassembly Drawing ...
Страница 20: ...15 804822 OPERATION PANEL ASSEMBLY ...
Страница 23: ......