P/N: C11746310 REV. AB
June 2022
39
4.A) END STOP ASSEMBLY
TIGHTEN TO 48 FT-LB
WARNING
Trolley stops (clip angles) or end stop assemblies
must be installed on both ends of the bridge beam to
prevent hoist trolley from running off the end of the
beam, which could result in injury to the operator and
others and damage to the load and other property.
Содержание SHAW-BOX 800 Series
Страница 13: ...P N C11746310 REV AB June 2022 13 CHAPTER 3 ASSEMBLING BRIDGE GIRDER TO UNDERHUNG END TRUCKS ...
Страница 16: ...P N C11746310 REV AB June 2022 16 3 C UNDERHUNG END TRUCK TYPES ...
Страница 18: ...P N C11746310 REV AB June 2022 18 3 E ROLLED CHANNEL END TRUCK ...
Страница 22: ...P N C11746310 REV AB June 2022 22 STEP 4 LOCATE ALIGN END TRUCKS UHFC ...
Страница 23: ...P N C11746310 REV AB June 2022 23 STEP 4A LOCATE ALIGN END TRUCKS UHRC ...
Страница 30: ...P N C11746310 REV AB June 2022 30 STEP 10 ASSEMBLING MOTOR AND GEAR REDUCER WITH END TRUCK ...
Страница 31: ...P N C11746310 REV AB June 2022 31 STEP 10A UHRC END TRUCK A4 DRIVE INSTALLATION ...
Страница 35: ...P N C11746310 REV AB June 2022 35 STEP 14 MOUNTING CROSS SHAFT BEARING AND COUPLING ON CROSS SHAFT SUPPORT ...
Страница 36: ...P N C11746310 REV AB June 2022 36 STEP 15 CHECKING HORIZONTAL ALIGNMENT OF THE CROSS SHAFT ...
Страница 37: ...P N C11746310 REV AB June 2022 37 STEP 16 ASSEMBLING COUPLING WITH CROSS SHAFT ...
Страница 38: ...P N C11746310 REV AB June 2022 38 CHAPTER 4 END STOP ASSEMBLY ...
Страница 40: ...P N C11746310 REV AB June 2022 40 CHAPTER 5 MOUNTING HOIST ON GIRDER ...
Страница 42: ...P N C11746310 REV AB June 2022 42 STEP 2 MOUNTING HOIST ON GIRDER ...
Страница 43: ...P N C11746310 REV AB June 2022 43 Y80 800 HOIST INSTALLATION STEP 1 PREPARATION FOR MOUNTING HOIST ON GIRDER ...
Страница 44: ...P N C11746310 REV AB June 2022 44 STEP 2 MOUNTING HOIST ON GIRDER ...
Страница 45: ...P N C11746310 REV AB June 2022 45 CHAPTER 6 FESTOON SYSTEM INSTALLATION ...
Страница 46: ...P N C11746310 REV AB June 2022 46 6 A PLAN VIEW ...
Страница 48: ...P N C11746310 REV AB June 2022 48 STEP 3 C RAIL MOUNTING ...
Страница 49: ...P N C11746310 REV AB June 2022 49 STEP 4 C RAIL JOINT ASSEMBLY ...
Страница 50: ...P N C11746310 REV AB June 2022 50 STEP 5 MOUNTING BRIDGE PANEL ...
Страница 51: ...P N C11746310 REV AB June 2022 51 STEP 6 END STOP ASSEMBLY ...
Страница 52: ...P N C11746310 REV AB June 2022 52 STEP 7 HOIST CABLE ASSEMBLY ...
Страница 53: ...P N C11746310 REV AB June 2022 53 STEP 8 CONTROL PENDANT CABLE ASSEMBLY ...
Страница 57: ...P N C11746310 REV AB June 2022 57 STEP 10 TOW ARM KIT INSTALLATION Y80 800 ...
Страница 66: ...P N C11746310 REV AB June 2022 66 CHAPTER 7 RADIO CONTROL HORN INSTALLATION FOR FESTOON SYSTEM ...
Страница 70: ...P N C11746310 REV AB June 2022 70 NOTES ...