background image

8

 

 

Initial inspection 

Interval inspection 

Inspections and service 
work 

when  
commissioning 

after 
50 service  
hours 

after 
200 service  
hours 

 

daily 

after 
200 service 
hours 

 

annual 

Compressed air 
components 
compressed air supply 

 

 

 

 

 

 

Press-button control Strain 
relief 

 

 

 

 

 

 

Lubricate load chain 

 

 

 

 

 

 

Check for wear in chain 
drive 

 

 

 

 

 

 

Function of slip clutch 

 

 

 

 

 

 

Function of brake 

 

 

 

 

 

 

Chain bolts for cracks 

 

 

 

 

 

 

Check suspension and 
load hooks for cracks and 
deformation 

 
 

 

 

 
 

 
 

 
 

 

 

Screwed connections for 
tightness 

 

 

 

 

 

 

Check trolley for cracks 
and deformation 

 
 

 

 

 
 

 
 

 
 

 

 

Oil level in gearbox 

 

 

 

 

 

 

Oil change, gearbox 

 

 

 

 

 

 

Check hoist motor and 
gearbox 

 

 

 

 

 

 

Check trolley motor and 
gearbox 

 

 

 

 

 

 

Grease drive transmission 

 

 

 

 

 

 

Grease lower block 

 

 

 

 

 

 

 

6. SERVICE

Service and inspections may only be carried out by a compe-
tent person.
The inspection must determine that all safety devices are
present and fully operational and cover the condition of the
hoist, lifting gear, accessories and supporting constructions.
The service intervals inspections noted are for normal work-
ing conditions. Adverse working conditions e.g., heat or chemi-
cal environments can dictate shorter periods.
Yale pneumatic hoists conform to the machinery group 1AM
resp. 1Bm in accordance with FEM 9.511. This results in a
theoretical service-lifetime of 800 resp. 400 operating hours
under full load. This is equivalent to 10 years under normal
operating conditions. After this period the hoist requires a gen-
eral overhaul. Further information is contained in VBG 9 resp.
FEM 9.755.

6.1 DAILY CHECKS

1.) Visually check the pendant control unit and air hoses for
damage.
2.) Check that the brake functions correctly.
3.) Check that the overload safety device functions correctly.
4.) Chain hoists with trolley:
      – Check that the trolley runway is free from obstructions.
      – Check that the end stops on the trolley runway are fitted

and secured.

6.2 REGULAR INSPECTIONS, SERVICE, TESTING

According to national and international safety regulations hoist-
ing equipment must be inspected annually by a competent
person. Adverse working conditions e.g., heat or chemical
environments can dictate shorter periods.
The commissioning and inspection details can be noted in the
enclosed inspection sheet.
Repairs may only be carried out by specialist workshops that
use original Yale spare parts.

Attention:

 Disconnect the air supply before performing test

unless air is required for a particular test.

Содержание CPA Series

Страница 1: ...1 ModelCPA OperatingandServiceInstructions SparePartsList Issue January 2002...

Страница 2: ...6 218 CPA 50 3 5000 2 2 9 4 4 5 2 3 0 140 202 206 218 CPA 60 3 6000 2 2 6 4 4 5 6 3 2 140 202 206 218 Value at 6 bar flow pressure Air consumptionwith rated load 4 7m 3 min Otherlifting heightsavailab...

Страница 3: ...personnel are in the danger zone Do not allow personnel to pass under a suspended load After lifting or tensioning a load must not be left unattended for a longer period of time Start moving the load...

Страница 4: ...op as an operational limit device see fig 1 chain stop Do not throw the hoist down Always place it properly on the ground 2 3 COMMISSIONING Inspection before initial operation Each hoist must be inspe...

Страница 5: ...olerances given see page 6 Enlarging the clearances e g to enable the trolley to negotiate tighter curves is forbidden 3 ASSEMBLY 3 1 Inspection before assembly Check for transport damage Check for co...

Страница 6: ...maintained The centre traverse is centred below the beam That all 4 locknuts are fitted and secured 11 Model CPA VTG only To fit the handchain position the slot on the outer edge of the hand chain whe...

Страница 7: ...t and are all locking devices in place and secure Are the end stops on the trolley runway in place and secure Is the hoist correctly reeved Is the chain stop correctly fitted to the loose end of the l...

Страница 8: ...horter periods Yale pneumatic hoists conform to the machinery group 1AM resp 1Bm in accordance with FEM 9 511 This results in a theoretical service lifetime of 800 resp 400 operating hours under full...

Страница 9: ...from the chain wheel Operate the hoist in the lift direction to feed the new chain through the hoist 4 Fitting lower block and chain stop Slide the end buffers over the chain ends and refit lower blo...

Страница 10: ...ure Check for tears or wear Suspension bolts Connection between hoist and suspension hook resp trol ley Check for cracks or wear Ensure all safety devices are in place and secure 6 7 OVERLOAD PROTECTI...

Страница 11: ...the planet carrier 22 13 Remove planet carrier 22 and pinion 21 from the plant carrier 3 14 Remove bearing 20 and bearing plate 15 from the planet carrier 3 15 Remove the circlip 11 from the planet c...

Страница 12: ...further disassembled on the workbench To remove the sealing plates 5 and 20 it can be helpful to tap the rotor shaft ends on a wooden surface The motor cylinder 9 can now be removed and the vanes can...

Страница 13: ...the rotor 12 must rotate freely If the rotor is hard to rotate or does not rotate at all it can be helpful to apply light taps with a rubber hammer to the motor housing 1 to the side or axially to se...

Страница 14: ...14 1 2 6 4 7 8 9 11 11 15 20 25 5 7 Fig 16 Hoist body 3 10 18 22 17 14 16 13 23 29 12 26 14 14 14 Motor siehe Seite 18 19 Motor see page 18 19...

Страница 15: ...3 11 Screw 2 9102254 9102254 9102254 9102254 9102254 12 Air motor 1 0850003 0850003 0850003 0850003 0850003 13 Planetary gearbox 1 0609678 0608814 0609678 0608814 0608814 14 Screw 8 9101660 9101660 91...

Страница 16: ...03 0609908 18 Capacity plate 2 0600001 5 Ball kit 15 pieces 5 1 0404767 0404767 19 Nail 3 x 4 8 9128004 6 Set screw 1 9114030 9114030 20 Screw 2 9102053 7 Circlip 1 9139020 9139020 21 Nut 2 9115118 8...

Страница 17: ...2 3 Yale Part No No Description Qty all units 1 Chain container assy for 13 m chain 1 06109467 1 Chain container assy for 21 m chain 1 06109468 2 Screw 1 9102255 3 Nut 1 9115098 1 Fig 18 Chain contain...

Страница 18: ...18 Fig 19 Gearbox...

Страница 19: ...0242 35 Shaft 1 00600257 11 Retaining ring 1 09129070 36 Bearing 1 09150043 13 Ring 1 00600243 37 Retaining ring 2 09129029 14 Retaining ring 1 09129071 38 Lock screw 1 00600258 15 Ring 1 00600244 39...

Страница 20: ...00800016 44 Brake disc assy 1 00800028 9 Motor cylinder asymmetric 1 00800017 45 O Ring 1 09171165 10 Roll pin 1 09134052 46 Air brake housing 1 00800039 11 Roll pin 1 09134048 47 Quad Ring 1 00800044...

Страница 21: ...16 Control piston assy lift 1 00800037 4 Cover 1 00800048 17 Control piston assy lower 1 00800038 5 Switch piston 1 00800035 18 Glyd Ring assy 2 00800055 6 Pneum Lip ring 1 00800049 19 Pneum Lip ring...

Страница 22: ...96 21 Screw 6 09102175 5 Shaft l 1 00800062 22 Centring ring 2 00800070 6 Key 1 09131025 23 Spring guide 2 00800071 7 Seal bushing 2 00800063 24 Spring 2 00800072 8 Square ring 2 00800064 25 Plug 2 00...

Страница 23: ...0 Button red 1 00800081 2 Valve pusher 2 1 00800077 11 Spring compressor 1 00800082 3 Valve pusher 1 1 00800078 12 Stop screw 1 00800083 4 Retaining ring 2 09130059 20 Ball 1 09159016 5 Ball 2 0915901...

Страница 24: ...rol housing assy 1 00800087 10 Button red 1 00800081 2 Valve pusher 2 2 00800077 11 Spring presser 1 00800082 3 Valve pusher 1 2 00800078 12 Stop screw 1 00800083 4 Retaining ring 4 09130059 20 Ball 1...

Страница 25: ...1 0559163 8 Locknut 4 9115155 2 Sideplate 1 0559167 9 Roller 4 0508210 3 Roll pin 4 9134120 10 Bearing 8 9151079 4 Traverse beam width A 2 0559169 11 Retaining ring 4 9129003 4 beam width B 2 0559170...

Страница 26: ...003 12 Nut 2 9115148 4 Mounting 1 0508229 13 Drive shaft 1 0710029 5 Guide 1 0710030 14 Roll pin 1 9134052 6 Lockwasher 4 9122016 15 Hand chain sheave 1 0558061 7 Screw 2 9101050 16 Hand chain 4307654...

Страница 27: ...3038 6 Drive shaft 1 0719372 18 Connection 1 9184082 7 Key 1 9131072 19 Air motor 1 00810001 8 Needle bearing 1 9153077 20 Reducer 1 0719868 9 Retaining ring 1 9129016 21 Bushing 1 0719870 10 Screw 4...

Страница 28: ...28 Fig 29 Air motor for trolley...

Страница 29: ...Bearing 1 09151086 32 Retaining ring 1 09130034 7 Retaining ring 1 09130045 33 Drive shaft 1 00800191 8 Spacer ring 1 00800092 34 Retaining ring 1 09129029 9 Motor cylinder 1 00800126 35 Key and slee...

Страница 30: ...30 Inspection notes Inspection before initial operation by Commissioning date Scheduled inspections Date Result Repair Test on by Competent person...

Страница 31: ...st Serial number from manufacturing year 01 00 serial numbers for the individual capacities models are registered in the production book with the remark CE sign Relvant EC Directives EG Machinery Dire...

Отзывы: