background image

Use tie-down locations in rails. 

make sure installation is 

secure by tugging at box.

• The box should not slide

on the bars.

• Open the box and tighten

levers if necessary.

CHECK iNSTallaTioN BEFoRE dRiViNG aWaY

CENTER HEaViER loadS iN 

THE CENTER oF THE Box.

• Turn key clockwise.

• To unlock, insert

key and turn key

counterclockwise.

alWaYS SECuRE THE load 

iNSidE THE Box.

• Insert key and turn it to 45º

counter clockwise. Remove key.

• Insert control key

and remove core

with control key.

• Install new lock core.

Follow instructions

that came with your

lock core purchase.

• Close box.

NOTE: Box must be closed 

and handle in horizontal 

position in order to lock 

box and remove key.

To lock...

To replace lock core...

Отзывы: