Use tie-down locations in rails.
make sure installation is
secure by tugging at box.
• The box should not slide
on the bars.
• Open the box and tighten
levers if necessary.
CHECK iNSTallaTioN BEFoRE dRiViNG aWaY
CENTER HEaViER loadS iN
THE CENTER oF THE Box.
• Turn key clockwise.
• To unlock, insert
key and turn key
counterclockwise.
alWaYS SECuRE THE load
iNSidE THE Box.
• Insert key and turn it to 45º
counter clockwise. Remove key.
• Insert control key
and remove core
with control key.
• Install new lock core.
Follow instructions
that came with your
lock core purchase.
• Close box.
NOTE: Box must be closed
and handle in horizontal
position in order to lock
box and remove key.
To lock...
To replace lock core...