background image

Figure -3

CONNECTION DIAGRAM OF

ELECTRICL

CABLE TO CIRCULATION

PUMP

Figure -4

3 -

OPERATING CENTRAL HEATING STOVE

3.1

When installation becomes completed,

you must open the valve in order to give water to boiler's return

line (Figure

-

2/9) from

service water

line.

3.2

Valve must be closed when 1/4 of expansion tank is filled.

3.3

Empty

cable ends

must

be

connected

to

circulation pump (Figure

-

2/3)

as seen

in

(Figure

-

3)

3.4

Plug must be inserted to grounded socket. One of the lamps (from two

lamps

-

Figure

-

3/10) show

that there is electricity and the other

one

indicated that

electricity comes to

circulation pump (Figure

-

2/3). Operating of circulation pump is

provided by adjusting the thermostat of pump (Figure

-

2/11)

to

zero degree.

3.5 By removing big yellow

screw on

the circulation pump, be

sure that the

tip of

motor

shaft taking

place

inside turns. If it is not turning, shaft must be turned

once

with the screwdriver. Big yellow screw is

applied

to

its

place

when

shaft

starts to turn.

3.6

Air of the

cores

must

be removed. Water level of expansion tank must be controlled.

3.7

Water

is

given

to

the

system from

boiler's inlet pipe (Figure

-

2/9)

from

service

water line.

3.8 After

becoming

sure

that there is

no

leakage in the system, fuel is loaded to the firing chamber and

then the

fire is set. Pump thermostat (Figure

-

3/10) is adjusted. Pump will start working when the

temperature of the

water

exceeds 40°C.

3.9 Temperature of

the boiler's water

(which is determinant for the temperature of the room) is adjusted

from

chain

driven thermostatic

regulator (Figure

-

2/6). Chain driven thermostatic regulator automatically

controls

burning speed of Central Pleating Stove and

it maintains the heat of the water fixed at the

adjusted temperature.

3.10 In order to obtain

a

good heat, coal must be preferred by having 6.000-7.000

kcal/hour value, having

less ash residue and

it must be dry and without dust and must have orange and walnut size. Big

coal comforts air

inlet.

Содержание 302

Страница 1: ...OPERATING MANUAL Please do not use your Central Heating Stove before reading this manual with Fireplace Stoveand Solic Fuel cc MODEL NO English...

Страница 2: ...We thank you for choosing Yakar Products You will always obtain maximum output When you read this Operating Manual prepared to assist you and as long as you comply with the instructions in it...

Страница 3: ...THE LOCATION TO PLACE AND INSTALLATION INSTRUCTIONS 4 5 ELECTRICAL DIAGRAM 6 301 and 302 INSTALLATION CONNECTION DIAGRAM 7 OPERATING CENTRAL HEATING STOVE 8 WARNING and RECOMMENDATIONS 9 CHIMNEYS and...

Страница 4: ...rounding RE FUELLING INTERVALS Burning Condition Fuel Type Re Fuelling Interval Nominal 6 000 kcal hour coal 5 hours Slow 6 000 kcal hour coal 12 hours EXHAUST GAS TEMPERATURE Exhaust Gas temperature...

Страница 5: ...Rear Housing Lid 15 Riaht Housina Lid 14 Lef Housing Lid 13 Ashtray 12 Oven Glass 11 Cleaning the cover from the too 10 Lid Hamdle 9 Bottom Lid 8 Ceramic Glass 7 Middle Lid 6 Oven Lid 5 Pull And Dump...

Страница 6: ...with conic pipe couplings 2 12 Steam exit taking place on the expansion tank must be extended to restroom bathroom or to ventilation medium 2 13 Main line pipes of the installation must be R1 one fing...

Страница 7: ...Outlet 9 Water Flow Back To Boiler 10 Indicator Light 11 Thermometer thermostat 12 Water Level Indicator 13 herald steam dispose 14 steam outlet Make the installation of radiator heaters to structure...

Страница 8: ...be turned once with the screwdriver Big yellow screw is applied to its place when shaft starts to turn 3 6 Air of the cores must be removed Water level of expansion tank must be controlled 3 7 Water i...

Страница 9: ...e COKE Mix with Lignite with 1 3 rate WOOD Hu Hu Hu Hu Hu Hu Hu Hu 6650 7900 6500 7000 3200 4500 2500 3200 1100 2500 7000 7300 4500 5500 2000 3500 Kcal h Kcal h Kcal h Kcal h Kcal h Kcal h Kcal h Kcal...

Страница 10: ...mended one bracket FALSE RIGHT Figure 7 Expansion Connection Yanh Yanh Dogru Yanh Yanh Figure 6 Chimney Connection Expansion must be connected to boiler at least 1 degree incline s Figure 7 The roof r...

Страница 11: ...l and roof insulation must be done 4 This problem disappears after burning for a certain period of time and after the walls get warm LAST CORE IS NOT GETTING WARM 1 Horizontal pipe coming to the last...

Страница 12: ...either one of the seller dealer representative importer or manufacturer producer of the product when there is no service station If the malfunction of the product can not be eliminated within 30 Thir...

Страница 13: ......

Страница 14: ...the boiler water reach 70 90 C hot utility water can be obtained for a long period of time 6 HOW IS YOUR FURL COMBUSTION QUALITY In a good combustion after ignition and inflammation stage flame become...

Отзывы: