background image

FTV-1000 Operating Manual

50MHz Transverter

FTV-1000

Operating Manual

VERTEX STANDARD CO., LTD.

4-8-8 Nakameguro, Meguro-Ku, Tokyo 153-8644, Japan

VERTEX STANDARD

US Headquarters

10900 Walker Street, Cypress, CA 90630, U.S.A.

YAESU EUROPE B.V.

P.O. Box 75525, 1118 ZN Schiphol, The Netherlands

YAESU UK LTD.

Unit 12, Sun Valley Business Park, Winnall Close
Winchester, Hampshire, SO23 0LB, U.K.

VERTEX STANDARD HK LTD.

Unit 5, 20/F., Seaview Centre, 139-141 Hoi Bun Road,
Kwun Tong, Kowloon, Hong Kong

Содержание FTV-1000

Страница 1: ...apan VERTEX STANDARD US Headquarters 10900 Walker Street Cypress CA 90630 U S A YAESU EUROPE B V P O Box 75525 1118 ZN Schiphol The Netherlands YAESU UK LTD Unit 12 Sun Valley Business Park Winnall Cl...

Страница 2: ...FTV 1000 Operating Manual...

Страница 3: ...s Intercept Point Optimization direct feed to mixer during strong signal conditions and convenient interface jacks for acces sories The FTV 1000 is fully compatible with Yaesu s VL 1000 Quadra System...

Страница 4: ...s the received signals directly to the first mixer RF AMP Switch Selects the desired receiver front end preamplifier configuration CLASS A Switch This switch changes the final amplifier operating mode...

Страница 5: ...detected FAN This red indicator lights up when the cooling fan is activated This does not indicate a dangerous condi tion and it may occur in the receive mode as well as during transmission PROTECTIO...

Страница 6: ...o the MARK V FT 1000MP GND Terminal Use this terminal to connect the FTV 1000 to a good earth ground for safety and optimum performance Use a large diameter short braided cable BAND DATA Jack This 8 p...

Страница 7: ...vates an input RF power attenuator to attenuate excessive input power from an exciter by 6 dB This switch should normally be set to the off position when using the FTV 1000 with the MARK V FT 1000MP R...

Страница 8: ...0 Take care to ensure that these cables are connected properly BAND DATA LINBAND DATA ALC TX IN ATT ON OFF ANT NOR ALT TRANSCEIVER GND FRO M FP 29 TO MARK V FT 1000MP DC 30V 15A DC 30V 15A DC 13 8V 3A...

Страница 9: ...EXT ALC EXT SPKR TX GND OFF OFF LIN BACK UP ON ON CW SIDETONE ANT A ANT NOR ANT 1 ANT ALT HF Dipole Antenna 50 MHz Beam Antenna 50 MHz Beam Antenna HF Beam Antenna ANT 2 ANT 3 INPUT 1 GRAY EXT ALC BL...

Страница 10: ...discussion in the section to follow Frequency conversions now will be taking place based on an HF range of 28 30 MHz with con version either to 50 52 MHz or 52 54 MHz Examples of this conversion proce...

Страница 11: ...50 52 you must perform the above band edge initialization procedures again Transmission 1 All basic transmission features of the MARK V FT 1000MP are the same as utilized during transverter operation...

Страница 12: ...on page 7 for interconnection of the station components When using the VL 1000 maximum power output during 6 meter operation will be 500 Watts minimum Operation The operating procedure when using the...

Страница 13: ...mVrms 13 dBm TX Power Output 200 Watts Class A 50 W Antenna Impedance 50 Ohms nominal Spurious Emissions 60 dB or better Power Requirements 30 V and 13 8 V DC Power Consumption 13 8 VDC 30 VDC approx...

Страница 14: ...FTV 1000 Operating Manual Page 12 Note...

Страница 15: ...FTV 1000 Operating Manual...

Страница 16: ...perating Manual 0203L BK Copyright 2002 VERTEX STANDARD CO LTD All rights reserved No portion of this manual may be reproduced without the permission of VERTEX STANDARD CO LTD Printed in Japan E A B 3...

Отзывы: