Remove the machine from the packaging
and place on a level surface. Locate
the crank handle which is
taped to the bottom
inside of the machine.
Install the crank
handle by carefully
threading clockwise
(direction of the arrows)
into the lower rubber roller.
Cut the tie wraps holding
the upper cut bar and lower
guide together.
Step 1:
•
Remove the top cover of the
machine by lifting upward.
•
Grasp the handle on the lower
access door; pull to open.
Step 2:
•
Match the colored dots on the end
of each supply roll with the corre-
sponding dots on the side of the
machine.
Note which roll is identified as
“top” and “bottom”.
•
Slide the supply rolls into the
grooves in the sides of the machine,
making certain that the roll is
inserted completely.
Setting Up
Loading Supply Rolls