background image

DW/P

Installation

15

ba77278e01

01/2024

3.2.2 Steps for installation

1.

Install the drinking water panel

(see section 3.2.3 M

OUNTING

 

OF

 

THE

 DW/P 

DRINKING

 

WATER

 

PANEL

).

2.

Connect any IQ S

ENSOR

N

ET

 modules 

(see section 3.2.4 C

ONNECTING

 

THE

 IQ S

ENSOR

N

ET

 

MODULES

).

3.

Prepare the turbidimeter for operation

(see section 3.2.5 P

REPARING

 

THE

 

TURBIDIMETER

 

FOR

 

OPERATION

)

4.

Connect the turbidimeter to the MIQ/IC2 module

(see section 3.2.6 C

ONNECTING

 

THE

 

TURBIDIMETER

 

TO

 

THE

 MIQ/IC2 

MOD

-

ULE

)

5.

Supply the components with power

(see section 3.2.7 I

NSTALLING

 

THE

 

POWER

 

SUPPLY

).

6.

Install the chlorine sensor into the D 19 flow through armature

(see section 3.2.8 I

NSTALLING

 

THE

 

CHLORINE

 

SENSOR

 

INTO

 

THE

 D 19 

FLOW

 

THROUGH

 

ARMATURE

).

7.

Install the sensor into the D 17 flow through armature

(see section 3.2.9 I

NSTALLING

 

THE

 

SENSOR

 

IN

 

THE

 D 17 

FLOW

 

THROUGH

 

ARMATURE

).

8.

Connect the sensors to the MIQ/IDS module

(see section 3.2.10 C

ONNECTING

 

THE

 

SENSORS

 

TO

 

THE

 MIQ/IDS 

MOD

-

ULE

).

9.

Connection of the inlet and outlet

(see section 3.2.11 C

ONNECTION

 

OF

 

SAMPLE

 

OUTLET

 

AND

 

SAMPLE

 

INLET

).

10.

Tidy up the cables

(see section 3.2.12 T

IDYING

 

UP

 

THE

 

CABLES

).

11.

Provide the sample flow 

(see section 3.2.13 P

ROVIDING

 

SAMPLE

 

FLOW

 

AT

 

THE

 

SAMPLE

 

INLET

).

12.

Starting the measuring operation

(see section 3.3 S

TARTING

 

THE

 

MEASURING

 

OPERATION

).

Содержание wtw DW/P

Страница 1: ...OPERATING MANUAL ba77278e01 01 2024 DW P DRINKING WATER PANEL...

Страница 2: ...DW P 2 ba77278e01 01 2024 Copyright 2024 Xylem Analytics Germany GmbH Printed in Germany...

Страница 3: ...r qualification 12 2 4 Personal protective equipment PPE 13 3 Installation 14 3 1 Scope of delivery 14 3 2 Basic principles of installation 14 3 2 1 General installation instructions 14 3 2 2 Steps fo...

Страница 4: ...nsion 28 4 3 1 IQ SENSOR NET 28 4 3 2 Flow through armatures 28 4 3 3 Connect the tube to the click screw connection of the flow through armature 30 5 Technical data 31 5 1 Drinking water panel 31 5 2...

Страница 5: ...P operating manual The operating manual has a modular structure It consists of the operating man ual for the drinking water panel DW P and the operating manuals of all the com ponents used Operating m...

Страница 6: ...drinking water panel Further components of the drinking water panel are variable e g Measured parame ters The drinking water panel can be configured for the following measuring param eters Turbidimete...

Страница 7: ...water panel figure 1 2 Units of a fully equipped drinking water panel 1 Sample inlet 2 Turbidimeter 3 IQ SENSOR NET system with boreholes for the installation of further MIQ modules 4 Guide rail with...

Страница 8: ...2 Turbidity measurement Turbidimeter Turb PLUS 2000 3 IQ SENSOR NET system MIQ IDS module for connecting 2 or 4 IDS sensors System components controller and terminal Other components modules and sens...

Страница 9: ...Components in the liquid circle 1 Sample inlet 2 Pressure reducer 3 Dosage ball valve 4 Sampling valve 5 Flow indicator 6 Turbidimeter optional 7 Flow through armature for a chlorine sensor optional 8...

Страница 10: ...the 4 corners for wall fastening 2 Guide rail for mounting the flow through armatures 3 Cable outlet to tidy up cables behind the drinking water panel 4 MIQ IDS interface module 5 Cable outlet to tidy...

Страница 11: ...ht be damaged if the actions mentioned are not taken 2 1 2 Safety signs on the product Note all labels information signs and safety symbols on the product A warning symbol triangle without text refers...

Страница 12: ...operating manual example connecting electrical lines to the terminal strip 2 2 3 Unauthorized use The product must not be put into operation if it is visibly damaged e g after being transported it was...

Страница 13: ...ce of work You must always wear your PPE while doing dangerous jobs to avoid injuries or damage to your health figure 2 1 Personal protective equipment Personal protective equipment Typical examples P...

Страница 14: ...erating manuals Drinking water panel Components mounted 3 2 Basic principles of installation 3 2 1 General installation instructions Pay attention to the following points during installation The drink...

Страница 15: ...POWER SUPPLY 6 Install the chlorine sensor into the D 19 flow through armature see section 3 2 8 INSTALLING THE CHLORINE SENSOR INTO THE D 19 FLOW THROUGH ARMATURE 7 Install the sensor into the D 17 f...

Страница 16: ...king water panel is designed for wall mounting At the corners of the drinking water panel are four holes for wall mounting figure 3 1 Dimensions 1 Height 850 mm 2 Width 700 mm 3 Distance from the edge...

Страница 17: ...njury when transporting heavy loads Wear safety shoes for transport installation and mounting work see section 2 4 Personal protective equipment PPE Transport the drinking water panel with two people...

Страница 18: ...dimeter to the MIQ IC2 module Measuring instruments that have a current output can be connected to the IQ SENSOR NET with the MIQ IC2 module 6 Securely fasten the drinking water panel Make sure that t...

Страница 19: ...or the power supply of the IQ SENSOR NET within the framework of the drinking water panel one module with power supply is suf ficient To supply more components of the IQ SENSOR NET with power a power...

Страница 20: ...ing the sensor in the flow through armature 3 Sample feed tube 4 Sample outlet tube 5 Guide rail for mounting the flow through armature 6 Screw for draining the flow through armature 3 6 2 1 4 5 1 If...

Страница 21: ...nlet slowly for commissioning A strong pressure surge can de stroy the membrane figure 3 3 Install the chlorine sensor in the flow through armature 1 Marking on the chlorine sensor 2 Top edge screw gl...

Страница 22: ...ow through arma ture farthest from the cable opening figure 3 4 flow through armature for sensors with 17 mm diameter IDS sensors 1 Flow through armature 2 Screw gland for fixing the sensor in the flo...

Страница 23: ...urther over the sensor until the shaft of the sen sor is in contact with the screw gland When the shaft of the sensor is in contact with the screw gland the sensor is optimally exposed to the sample 7...

Страница 24: ...et funnel from the fastening 2 Push the open drain tube from the last flow through armature through the cover of the outlet funnel until it protrudes inside 3 Mount the cover of the outlet funnel onto...

Страница 25: ...ive goggles when connecting the sample feed to the drinking water plate see section 2 4 Personal protective equipment PPE 2 Slowly turn on the sample flow 3 In the presence of a turbidimeter Turb PLUS...

Страница 26: ...stem is started up The sample flow is set All sensors are displayed in the measured value display on the terminal of the IQ SENSOR NET 1 Make the settings for sensors on the IQ SENSOR NET see system o...

Страница 27: ...components 1 Stop the sample feed 2 Drain the flow through armatures 3 Loosen the screw glands on the flow through armatures 4 Pull the sensors out of the flow through armatures 5 Have containers read...

Страница 28: ...screws on the undersides of the flow through armatures again 3 Install the sensors in the flow armatures see section 3 2 8 INSTALLING THE CHLORINE SENSOR INTO THE D 19 FLOW THROUGH ARMATURE or see sec...

Страница 29: ...mounting the flow through armature 2 Insert a screw with washer in each of the two holes 7 and mount the flow armature on the rail 3 Connect the tube to the click screw connection on the sample outle...

Страница 30: ...p into the sleeve 1 of the click screw connection If the tube is not inserted deep enough the connection will not be tight figure 4 4 Insert the tube in the sleeve 3 Press the sleeve of the click scre...

Страница 31: ...flow Range of application Drinking water and swimming pool water Inlet and outlet Dimensions H x W x D Approx 850 x 700 x 13 mm Material PVC rigid foam spumed white 4 holes in the drinking water pane...

Страница 32: ...board white Material PVC Sealing material NBR Application temperature Max 40 C Flow rate Max 60 l h Pressure load Max 0 5 bar Process connection Polyurethane tube Outer diameter 6 mm Inner diameter 4...

Страница 33: ...rate Max 60 l h Pressure load Max 0 5 bar Process connection Polyurethane tube Outer diameter 6 mm Inner diameter 4 mm Installation vertical Sensor receptacle Mounting location for one sensor clamped...

Страница 34: ...nless steel Sealing and membrane mate rial NBR Application temperature Max 40 C Pressure before pressure reg ulator inlet Max 25 bar Deviating values when operated on the drinking water plate see sect...

Страница 35: ...perated on the drinking water plate see section 5 1 Component Power supply IQ SENSOR NET system DIQ S 28X See system operating manual IQ SENSOR NET DIQ S 28X IQ SENSOR NET mains power supply module Se...

Страница 36: ...DS2 480032 MIQ module for 4 IDS sensors MIQ IDS4 480034 Guide rail for mounting the flow through arma ture MS DWP 904001 Pressure regulator R1 2 Pr DN10 904000 Dosage ball valve Do DN10 904005 Mainten...

Страница 37: ...accessories or literature indicates that the product should not be disposed of with other waste at the end of its working life To prevent possible harm to the environment or human health from uncon t...

Страница 38: ...Disposal DW P 38 ba77278e01 01 2024...

Страница 39: ......

Страница 40: ...rove the way water is used conserved and re used in the future is central to our work Our products and services move treat analyze monitor and return water to the environment in public utility industr...

Отзывы: