Installation
DW/P
24
ba77278e01
01/2024
3.2.11 Connection of sample outlet and sample inlet
3.2.12 Tidying up the cables
The drinking water panel has cable passages to stow cables behind the drinking
water panel (see section 1.2.4).
The outlet funnel cover is attached to the outlet funnel.
1.
Loosen the cover of the outlet funnel from the fastening.
2.
Push the open drain tube from the last flow through armature through
the cover of the outlet funnel until it protrudes inside.
3.
Mount the cover of the outlet funnel onto the outlet funnel.
figure 3-5 Outlet funnel with mounted drain tube
CAUTION
The outlet of the DW/P drinking water panel may only be
connected to an open channel flow that is virtually pres
-
sureless.
4.
Direct the water from the outlet funnel to a drain for waste water.
5.
Connect the sample feed tube to the sample inlet.
Содержание wtw DW/P
Страница 1: ...OPERATING MANUAL ba77278e01 01 2024 DW P DRINKING WATER PANEL...
Страница 2: ...DW P 2 ba77278e01 01 2024 Copyright 2024 Xylem Analytics Germany GmbH Printed in Germany...
Страница 38: ...Disposal DW P 38 ba77278e01 01 2024...
Страница 39: ......