Pump Control Only

1. Instal a starter or relay in pump control circuit, 

as shown, to prevent damage to snap switch 
and help insure proper switch/control operation.
Failure to do so may shorten the life of the 
switch when actual amperage exceeds 
switch rating.

2. Connect wires from holding coil of pump starter 

or relay to terminals 1 and 2 as shown.

NOTE:

To help insure most effective operation, bal-

ance boiler feed pump(s) to deliver required water
feeder rate to match boiler steaming requirements.

1 2

4 5 6

LOAD

LINE

6

WIRING DIAGRAMS

Low Water Cut-Off Only

1. Main Line Switch - For burner circuits within 

the switch’s electrical rating.

1. Main Line Switch - For burner circuits within 

the switch’s electrical rating.

2. Pilot Switch-To holding coil of a starter when the

burner circuit exceeds the switch’s electrical rating.

LINE

LOAD

1 2

4 5 6

1 2

4 5 6

ALARM

NEUTRAL

HOT

ALARM

NEUTRAL

HOT

1 2

4 5 6

1 2

4 5 6

SEE PUMP

CONTROL

CIRCUIT

TO NEUTRAL

TO BURNER CONTROL CIRCUIT   

HOT

ALARM

1 2

4 5 6

LOAD

LINE (3 PHASE)

SEE PUMP

CONTROL

CIRCUIT

ALARM

1 2

4 5 6

LOAD

LINE

OR

OR

OR

Combination Pump Control, Low Water Cut-Off and Alarm

Alarm Circuit Only

1. Low Water Alarm

2. High Water Alarm

2. Pilot Switch - To holding coil of a starter when the

burner circuit exceeds the switch’s electrical rating.

1

8

7

6

2

L2

L1

N

H

3

4

5

COMMON

Pump

AC SUPPLY

HIGH

PROBE

LOW

PROBE

GND

Securely tighten all electrical conductors
to terminals

N.C. CONT.

N.O. CONT.

CONTROL

HIGH

LEVEL

PROBE

LOW

LEVEL

PROBE

ELECTRONIC PROBES:

Содержание McDonnel & Miller 157S-RBP-MD

Страница 1: ...INSTRUCTION MANUAL MM 221REVJ 210345...

Страница 2: ...BURNER OFF CASTING LINE PUMP ON PUMP OFF 11 2 38mm 4 102mm OPERATION Maximum Pressure 150 psi 10 5 kg cm2 Electrical Ratings Float Control Probe Control 750BM P 120 CI 157S RBP MD Settings and Differe...

Страница 3: ...ons along with all applicable codes and ordinances for piping blow down valve and water gauge glass requirements a Using a pipe wrench unscrew the plastic float blocking plug A from the float block ta...

Страница 4: ...iler manufacturer schematics should always be followed In the event that the boiler manufacturer s schematic does not exist or is not available from the boiler manufacturer refer to the schematics pro...

Страница 5: ...se supplied by others in Boiler Electrical Panel Install electrical conduit between Probe Housing and Boiler Electrical Panel Pull three 3 wires through conduit Boiler sight glass must be visible from...

Страница 6: ...e Switch For burner circuits within the switch s electrical rating 2 Pilot Switch To holding coil of a starter when the burner circuit exceeds the switch s electrical rating LINE LOAD 1 2 4 5 6 1 2 4...

Страница 7: ......

Страница 8: ...poses Seller warrants the goods purchased hereunder with the exception of membranes seals gaskets elastomer materials coatings and other wear parts or consumables all of which are not warranted except...

Отзывы: