![Xylem Bell & Gossett 15GDS Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/xylem/bell-and-gossett-15gds/bell-and-gossett-15gds_instruction-manual_3969272014.webp)
12
15GDS/20GDS Installation, Operation and Maintenance Manual
7. Provide a suitable barrier around the work area, e.g. a guard rail.
8. Make sure you have a clear path of retreat!
9. Use safety helmet, safety goggles and protective shoes.
10. All personnel who work with sewage systems must be vaccinated against diseases to
which they may be exposed.
11. A first-aid kit must be close at hand.
12. Note that special rules apply to installation in explosive atmosphere.
Follow all other health and safety rules and local codes and ordinances.
Installation (continued)
Содержание Bell & Gossett 15GDS
Страница 1: ...Models 15GDS 20GDS INSTALLATION OPERATION AND MAINTENANCE INSTRUCTIONS INSTRUCTION MANUAL IM214R02...
Страница 2: ...2 15GDS 20GDS Installation Operation and Maintenance Manual...
Страница 23: ...15GDS 20GDS Installation Operation and Maintenance Manual 21 Figure 2 Figure 3 Oil Change continued...
Страница 25: ...15GDS 20GDS Installation Operation and Maintenance Manual 23 Notes...