Xtreme Power Conversion Corporation
P90 User’s Manual
Page 14
Uninterruptible Power Supply
Step 1
Use 4 screws to mount right and left rail sliders in front of rack.
Step 2
Use 4 screws to mount right and left rail sliders in back of rack.
Step 3
Place the nuts in the proper location in the rack based upon height of UPS.