Hand Over

You and the customer should be satisfied that all aspects of commissioning the system have been addressed
and these meet the required standards. The system must be ready for day to day operation prior to hand over.
To hand over the system to the client, you should:

l

Ensure that the ICAM commissioning forms are complete and all relevant sections have been filled in

l

If you have used Xtralis VSC select the Device or Address then select

File | Print

to print out a copy of

configuration details and include a copy with the hand over documents.

l

Obtain the relevant signatures

l

Ensure that relevant attachments have been included with the commissioning form

l

Make copies of the completed commissioning forms and attachments and forward these to:

l

Appropriate Xtralis Sales Office

l

Installing contractor

l

Designer of the system

l

End user of the system

Содержание ICAM IFT

Страница 1: ...ICAM Commissioning Guide May 2018 Document 14972_02 Part Number 29303...

Страница 2: ......

Страница 3: ...uipment damage Xtralis is not responsible and cannot be held accountable for any liability that may arise due to improper use of the equipment and or failure to take proper precautions Only persons tr...

Страница 4: ...before you receive the appropriate training may void the warranty Document Conventions The following typographic conventions are used in this document Convention Description Bold Used to denote emphas...

Страница 5: ...fore going to the Site 7 3 2 ICAM Commissioning Form Prerequisites 7 3 3 Once on Site 7 4 System Configuration and Setting Thresholds 9 4 1 IFT Detector Configuration 10 4 2 ILS Detector Configuration...

Страница 6: ...ICAM Commissioning Guide ICAM by Xtralis 2 www xtralis com This page is intentionally left blank...

Страница 7: ...CAM system installation It forges together the elements of designing and installing a pipe network installing the detectors cabling for power and communications and the powering up of the system Your...

Страница 8: ...ICAM Commissioning Guide ICAM by Xtralis 4 www xtralis com This page is intentionally left blank...

Страница 9: ...r site Gather site information Obtain a copy of l Pipe network design records l Pipe network installation form l Site plans and pipe layout plans Start to fill in l Commissioning forms l Any regulator...

Страница 10: ...ICAM Commissioning Guide ICAM by Xtralis 6 www xtralis com This page is intentionally left blank...

Страница 11: ...Section 5 1 10 Optional Digital manometer if sample hole pressure is required to be measured l Wide Bore networks Max range 3kpa l Narrow Bore networks 0 20kpa at the end of the recommended length of...

Страница 12: ...ors l All LEDs turn on then off about five times and the sounder beeps about five times l Aspirator starts l Fault indicators are activated for current faults l Smoke levels are indicated on the bargr...

Страница 13: ...y be configured via the detector s user interface Where possible air flow thresholds and smoke alarm thresholds should be determined using ASPIRE pipe network configuration software When an ICAM detec...

Страница 14: ...ntrol functions require the user to enter an Access Code There are several levels of access 1 Operator 2 Level 1 3 Level 2 4 Level 3 Access Code Levels are downwards applicable for example if a User e...

Страница 15: ...relating to air flow is set through the CONFIGURE menu option Some of the key parameters are l FLOWDEL Flow Fault Delay 1 to 60 s l FLOWHI FLOWLO High and low air flow limits for declaring a Flow Faul...

Страница 16: ...ED flashes continuously to indicate the function selected To enable updates to the system enter the three digit access code 510 To enter numbers into the system each number must be sequentially select...

Страница 17: ...y for 1 sec to initialize function selection Press and release SELECT key to sequentially step through functions Press and release CHANGE key to modify setting The relevant LED flashes continuously to...

Страница 18: ...ICAM Commissioning Guide ICAM by Xtralis 14 www xtralis com This page is intentionally left blank...

Страница 19: ...Very sensitive sites can use the electrical overload PVC coated wire burn test or the smouldering test coil test UK customers can refer to BS 6266 BFPSA Code of Practice Appendix A for system perform...

Страница 20: ...suitable for the testing of high and enhanced sensitivity environments Smoke is produced by lighting a number of small smoke pellets You will need smoke pellets a tray and a method to time the test I...

Страница 21: ...esign Legend A 500mm 20 in B Kitchen foil in tray C 20mm 0 874 in Figure 5 2 Polyurethane Mat Smoke Test 5 1 5 Wire Burn Smoke Testing This test is performed by using a transformer to overload the pow...

Страница 22: ...g the above test procedure Enter the following results on the commissioning form l Transport Time Introduce smoke at the furthest sampling hole from the detector The time taken in seconds for the smok...

Страница 23: ...5 2 Testing Devices The outputs for the IFT detectors can be tested using a diagnostic test that is accessed through the TEST OUTPUTS menu function For more information please see the IFT Product Gui...

Страница 24: ...ICAM Commissioning Guide ICAM by Xtralis 20 www xtralis com This page is intentionally left blank...

Страница 25: ...ssioning forms are complete and all relevant sections have been filled in l If you have used Xtralis VSC select the Device or Address then select File Print to print out a copy of configuration detail...

Страница 26: ...ICAM Commissioning Guide ICAM by Xtralis 22 www xtralis com This page is intentionally left blank...

Отзывы: