5
6
CAUTION! TAKE CARE NOT TO BE CRUSHED!
2. Count the accessories according to the packing list.
3. Install the equipment body on the horizontal and firm workbench, and remove the
transportation fasteners.
4. Connect the power cable, air supply system, cooling water system and vacuum
system according to the instructions.
5. Do not move the equipment by handling the enclosure and movable door. Instead,
you shall handle the equipment bottom plate.
6. Do not move the equipment by pulling or pushing the equipment enclosure on the
floor.
2-2 EQUIPMENT COMMISSIONING
1. Turn on the equipment power switch. The lighting lamp of the processing area and
the screen will turn on.
2. Run the XMILL220, and click “MANUAL” button to enter the manual operation inter-
face, as shown in the following figure.
3. Click X+, X-, Y+, Y-, Z+, Z- and A+, A- respectively to check if all axes operate
normally.
4. Click “COLLET”, “SPINDLE”, “CLEANER”, “FIRST REFERENCE”, and “SECOND
REFERENCE” respectively to check if their actions and positions are normal. After the
inspection, stop the corresponding actions to avoid any danger to the subsequent opera-
tions.
5. After confirming that the above components function normally, click “AUTO” button to
enter auto interface, as shown in the following figure.
Figure 2-1