background image

After unscrewing the bracket and turn it the right way up, check the inlet of the housing for the water flow direction.  There is 
an arrow marked on the inlet and outlet of the housing cap.   
 

Make sure the system is installed in the right order. 

1.  SEDIMENT-X is the first stage (water INLET) 
2.  Carbon-X is the second stage 
3.  FT-300 is the third stage (water OUTLET) 

 
Screw the bracket onto the housing with the housing being in the order shown above

.  The arrow “IN” is the first stage and 

arrow “OUT” is the third stage.  The system is ready for wall mount once the brackets are in place.    
 
Make sure the system is mounted near a water supply tap. 
 

1. 

Tape the ¾” x 1” brass fittings and screw them into the “Inlet” and “Outlet” of the housings.   

2.  Mark screw locations at the desired positions. Use the two holes at the back of the XBB20-FT300 mounting bracket 

for marker guides.  

3.  Drill the holes into marked positions.  
4.  Turn the screws into the drilled holes and leave screw heads sticking out a little.  
5.  Hang XBB20- FT300 system onto screws. 

 
 

4.0 SETUP SPECTRUM UV SYSTEM 

 
Follow the steps below to setup the Spectrum UV system.   

 

 
 

4.0 CONNECTING UP FRONTIER AND UV SYSTEM

 

Check the labeling detail on FRONTIER FT-300 system before connecting up the system.   Installing a pressure limiting 
valve is strongly recommended.   
 

1.  The first stage of the FRONTIER FT-300 system is marked with arrow in (SEDIMENT-X) from the left hand side of 

the system.   

2.  Connect the inlet and arrow out (FT-300) to the 

BOTTOM

 inlet of the Spectrum UV system.   

3.  Connect the TOP outlet of the Spectrum UV system to the require application.  

 

Отзывы: