Install Barbell Holder(15) to Base Tube(18) using Flat Washer
Φ
13.5*
Φ
24*2.5(39),Nut M12(41) and
Hex Bolt M12*100(43);
Install Band Peg(17) to Base Tube(18) and Top Connect Tube(1) using Big Flat Washer
Φ
9*
Φ
24*2(38)
and Hex Bolt M8*25(42) .
V
VI
Put Long Safety Arm(4&5),Dip Bar(6&7),J-Hook(8&9) and Safety Bar(10&11) on right position as
your required.
Note,please fix Safety Bar(10&11) using 2 pieces Pin (12).