22
8. Reinstall the conveyor opening flaps in each oven deck. A series of holes in the flaps allow
adjustment for different heights of food product.
9. Control box heat shields need to be installed on any multi-deck installation. For xx70 models,
they are required on both ends. To install, remove the four (4) control box screws under the
conveyor. Place the panel with the notch towards the bake chamber. Line up the slots with the
existing holes and replace the screws.
Oven Assembly
Conveyor Opening Flap
Thumb Screws
Lower Control Box Plate
Control Box Screws
Lower Control Box Plate Notch
Stacking the Ovens
Содержание 1832-AE-B
Страница 43: ...43 This page intentionally left blank ...
Страница 88: ...This page intentionally left blank ...
Страница 95: ...95 Oven Schematic 1832 2440 3240 3255 3855 Square Burner Standard ...
Страница 96: ...96 Oven Schematic 1832 2440 3240 3255 3855 Square Burner World ...
Страница 97: ...97 Oven Schematic 1832 2440 3240 3255 3855 Round Burner Australia ...
Страница 98: ...98 Oven Schematic 3270 3870 Square Burner Standard RH Control Box ...
Страница 99: ...99 3270 3870 Square Burner Standard LH Control Box Oven Schematic ...
Страница 100: ...100 Oven Schematic 3270 3870 Square Burner World RH Control Box ...
Страница 101: ...101 Oven Schematic 3270 3870 Square Burner World LH Control Box ...
Страница 102: ...102 3270 3870 Round Burner Australia LH Control Box Oven Schematic ...
Страница 103: ...103 Oven Schematic 3270 3870 Round Burner Australia RH Control Box ...
Страница 104: ...104 Hood Schematic Standard ...
Страница 105: ...105 Hood Schematic World ...
Страница 106: ...106 Hood Schematic Without VFD Controller ...