![Xirrus XR-520 Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/xirrus/xr-520/xr-520_quick-installation-manual_887596011.webp)
XR-520 Q
4d) Dire
The mou
cm) apar
You will
construct
size recom
Head.
NOT
remo
moun
1)
Mark
apar
Tem
2)
Insta
1/8”
of th
3)
Alig
prot
on th
until
5) Con
The XR-5
details on
Powe
powe
Data
Conn
GIG
Quick Installat
ect Ceiling
unting holes
rt, on center.
need two sc
tion materia
mmended is
TE: The XR-5
ve the back
nting.
k the locatio
rt, on center)
mplate on pag
all two screw
(.32 cm) bet
he screw.
gn the holes i
ruding from
he screw hea
l it locks on
nnect th
520 is power
n the Xirrus-
er
: The XR-5
er injectors, o
: Data is sup
nect the Ethe
POE
port as
tion Guide
g Mountin
on the back
crews of an a
al at the mou
s #8. The rec
520 must not
of the AP to
on for the tw
). You may u
ge 16, if you
ws in the ceil
tween the m
in the back o
m the ceiling.
ads and rota
the screw he
he Cable
red by the G
-supplied in
520 is only po
or 802.3af or
pplied to the
ernet cable ca
s indicated.
ng withou
of the XR-52
appropriate
unting site. T
ommended
t be disassem
o tighten the
wo mounting
use the Direc
wish.
ling so that t
ounting surf
of the XR-520
. Push the XR
ate the XR-52
eads.
es
igabit Ethern
njector modu
owered thro
r 802.3at PoE
Gigabit por
arrying data
- 9 -
t Mountin
20 are 3.5” (8
type for the
The max scr
head type is
mbled – do n
e screws afte
g screws (3.5”
ct Mounting
they protrud
face and the
0 over the sc
R-520 chassi
20 to the righ
net connecti
ules.
ough the
GIG
E-compliant
rt via the sam
a and power
ng Plate
8.9
e
rew
s Pan
not
er
”
g
de
e head
crews
is up
ht
ion. See the
P
G POE
port.
switches, m
me cable tha
r from the Po
PoGE Install
. Only Xirru
may be used.
at powers the
oGE injector
ation Guide
f
s-supplied
e XR-520.
r to the XR-5
for
20’s