Xintex G-1BB-24-R Скачать руководство пользователя страница 6

Part Number

 

18141, H, 01/28/2020

 

 

Installation 
 
Installing the Display Unit (G1BR-B01-D/G1CR-B01-D or G2BS-B01-D) 
 
The Display Unit should be located at the instrument panel, so that the visible and audible 
indicators may be easily observed.   
 
Drill a 2-

1/16” hole to accommodate 

the G1BR-B01-D/G1CR-B01-D Display Unit. 

Drill a 2-

1/8” hole to accommodate the G2BS

-B01-D Display Unit. 

 
Insert Display Unit into hole and secure with the provided threaded mounting nut.  A Trim Ring is 
available if needed. 
 

NOTE 

DO NOT MAKE ELECTRICAL CONNECTIONS AT THIS TIME.  THEY WILL BE ADDRESSED IN A LATER 
SECTION. 
 
Routing Sensor Cable(s) (FS-

X01 CABLE XX’)

 

 
A 20 FT Sensor Cable is provided for each Gasoline Fume Sensor.  The Sensor Cables should be 
routed starting at the Display Unit, then to the pre-determined location of the Gasoline Fume 
Sensor.  Connect to the Display Unit using the attached quick-disconnect connectors.  Take care 
not to pinch, break, or cut the Sensor Cable or put too much stress on the connectors while 
routing the cable.  Secure the Sensor Cable with the appropriate hardware for the application.   
 

NOTE 

DO NOT CUT EXTENSION CABLE FOR ANY PURPOSE.  DOING SO VOIDS THE PRODUCTS 
WARRANTY.  LONGER CABLES ARE AVAILABLE FROM 20 FT TO 100 FT.   
 
Installing Gasoline Fume Sensor(s) (FS-T01) 
 
The 

Gasoline Fume Sensor should be located in the Bilge, just above the “Slosh Line”.  A good rule 

of thumb is to install no lower than the height of the starter solenoid.  Avoid locating sensors near 
manifold or exhaust systems, as high heat may damage the sensor.   

 

Use the appropriate #8 mounting hardware to mount the Gasoline Fume Sensor in the desired 
location.  The rubber gasket should be installed between the sensor and the mounting surface.   

 

Connect to the Extension Cable using the attached quick-disconnect connectors.   

 
 
 
 
 

 

Содержание G-1BB-24-R

Страница 1: ...24V Solenoid G 1CB R Chrome Round Blower Control 12V Solenoid G 1CB 24 R Chrome Round Blower Control 24V Solenoid Dual Channel System G 2BB R Black Square Blower Control 12V Solenoid G 2BB 24 R Black...

Страница 2: ...4 Installation 6 Installing the Display Unit G1BR B01 D G1CR B01 D or G2BS B01 D 6 Routing Sensor Cable s FS X01 CABLE XX 6 Installing Gasoline Fume Sensor s FS T01 6 Electrical Connections G1BR B01...

Страница 3: ...tem Specifications G 1BB R G 1CB R Operating Voltage 9 30V DC Nominal Current Draw 55mA 12V DC Maximum Current Draw 95mA 9V DC Maximum Blower Output Current 2A Operating Temperature 40 F 40 C to 185 F...

Страница 4: ...The Red LED located at the bottom indicates a fume buildup of 20 of the LEL Lower Explosive Limit which is considered an alarm The Blower status LED and alarm horn will actuate when the Red LED is il...

Страница 5: ...Switch YELLOW Switching Ground 2A Fuse Included Positive voltage from Blower Circuit Breaker MB30RLY 30 85 87 86 G1BR B01 D G1CR B01 D FS X01 CABLE XX FS T01 RED Power 1 0 Amp Fuse from Circuit Break...

Страница 6: ...of the Gasoline Fume Sensor Connect to the Display Unit using the attached quick disconnect connectors Take care not to pinch break or cut the Sensor Cable or put too much stress on the connectors whi...

Страница 7: ...e Detectors can be tested by pressing the Check Reset button on the face of the Display Unit The Display Unit will cycle through the LEDs and the alarm horn will activate while the LEDs cycle Unplug t...

Страница 8: ...and make any necessary repairs Repairing Xintex Gasoline Fume Detection Components Xintex Gasoline Fume Detection Components are not field serviceable Components must be returned to the factory for a...

Страница 9: ...ent of Fireboy Xintex LLC does not assume the costs of removal and or installation of the product or any other incidental costs of removal and or installation of the product or any other incidental co...

Отзывы: