34
TGC65-MT/UT/ET (Unit: mm)
Download
PLC
24V 0V FG
1 2 3 4
PWR
410.0
270
.0
65.0
395.0
255
.0
56.5
399.0
259
.0
3-4-2 Installation and using environment
Install requirements:
TG has four ferric mounting racks when out of factory, there are two square holes on the
up, down side of TG, use mounting rack to fix the TG with control cabinet.
In order to avoid TG temperature too high after long time working, please keep 10cm
space on the up/down and 5cm on the left/right side of the TG when installing.
Install steps:
1. Refer to the dimension in the former chapter to open a rectangle mounting hole in
the control cabinet;
2. Add airproof circles in the airproof slot when installing;
3. Insert the bottom of TH into the mounting hole of control cabinet;
Fixed bracket
Install panel
Содержание TP Series
Страница 1: ...TP TH TG series HMI manual Hardware WUXI XINJE ELECTRIC CO LTD Data No HC 01 20120105 2C6...
Страница 2: ......
Страница 4: ......
Страница 40: ......