XINDA CTHT2-F5S26 Скачать руководство пользователя страница 4

4

Installation step 5

Adjust the length of the beam (4) according to the panel size

Tighten the panel and hand
controller (10) with self
tapping screw st4.8 (B)

Installation step 4

Insert one end of the transmission rod (5)
into the left post (2) according to the steps,
and then insert the plastic end of the other
end into the right post (3). If the position
cannot be connected, adjust the position
by hand/open spanner (prepared by
yourself).
Apply the black sponge gasket (I) evenly on
the top of the object to provide shock
protection. The position can be determined
by yourself.
Note: The adjustment Angle should not
exceed one tenth of a turn

Installation step 6

Customer owned

Power on after wiring!

Отзывы: