XCEL 7958-NPF Скачать руководство пользователя страница 5

 

Layout Installation 

 

Using the image as a guide, establish your fence line by staking out the areas you wish to enclose.

 

 

Mark every 6.5’ section to identify location of the posts.

 

NOTE: 

If you are left with a space less than a full size panel, the rails can be cut down to fit the space by 

using a hacksaw. 

 

Attach string to each stake 

 

 

 

 
 
 
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTE

: Make sure all posts are set to have an opening 

of 76-1/2” wide. 
Be sure all posts are leveled. 
Prior to fence panel installation, make sure concrete is 
set and dry to avoid shifting of the posts. 

 

Sketch out your fence plan to paper. 

 

Show  the  house,  driveway,  deck,  and 
property  lines  in  your  diagram  to 
estimate materials and location of your 
fence. 

 

Measure accurately with tape measure 
and identify those on your sketch. 

Fence Panel 

Содержание 7958-NPF

Страница 1: ...ws you to install a fence panel at the job site with ease Built from strong wrought iron pre galvanized inside and out double powder coated black Features 3 Rails Spear Top Flat Bottom Aspen Style Pan...

Страница 2: ...d utilities Sketch Plan and confirm materials Draw and sketch out your fence plan Plan the location of corners and gates Measure accurately with tape measure and identify all measurements on your draw...

Страница 3: ...Bolts 1 pc Flange Flange Cover Concrete Use 1 pc Installation Instructions Manual 18 ATTENTION PLEASE MAKE SURE ALL CONTENTS ARE IN THE FENCE KIT DO NOT ATTEMPT TO ASSEMBLE THE FENCE IF PARTS ARE MISS...

Страница 4: ...4 Required Tools Materials for Assembly Power Hammer Drill Tape Measure String Stakes Level Post Hole Digger Concrete Mix Socket Wrench Hacksaw Product Overview Gate Sold Separately Brackets...

Страница 5: ...ace by using a hacksaw Attach string to each stake NOTE Make sure all posts are set to have an opening of 76 1 2 wide Be sure all posts are leveled Prior to fence panel installation make sure concrete...

Страница 6: ...om rail 3 Adjust top rail to clip onto picket holes 4 Insert individual pickets into the rail holes and make sure pickets are secured 5 Align the middle rail 4 below the top rail 6 Panel assembly is n...

Страница 7: ...epeat steps for middle and bottom rails 4 Secure brackets with tek screws 5 Insert pickets through the rails and make sure pickets are secured into rails 6 Installation is now complete 1 Dig hole 18 d...

Страница 8: ...ws 5 Insert pickets through the rails and make sure pickets are secured into rails 6 Installation is now complete 1 Use included Flange to drill holes on concrete floor Drill bit is 15 32 in size Hamm...

Отзывы: