Release A
23
Section 2. Installation
Introduction
This section provides recommendations and procedures for inspecting, installing,
and testing the power supply.
Basic Setup Procedure
See
Table 2.1
for a summary of the basic setup procedure and a view of the
subsections in this section. Use this procedure as a quick reference if you are
unfamiliar with the installation requirements for the power supply. Each step in the
procedure refers to subsequent sections which contain more details. Follow each step
in the sequence given.
Table 2.1
Basic Setup Procedure
Step
#
Description Action
Reference
1
Inspection
Perform an initial physical
inspection of the power
supply.
“Inspection, Cleaning, and
Packaging” on page 24
2
Installation
Install the supply (bench or
rack mount). Ensure
adequate ventilation.
“Location, Mounting, and
Ventilation” on page 27
3
Input Power
Connect AC input power.
“AC Input Power Connection”
on page 28
4
Test
Perform functional tests for
voltage mode operation,
current mode operation,
and front panel controls.
“Functional Tests” on page 29
5
Load
Connect the load.
“Load Connection” on page 30
6
Sensing
Connect sensing lines.
“Remote Sensing” on page 33
Содержание XPD 120-4.5
Страница 2: ......
Страница 3: ...Operating Manual for XPD Series Programmable DC Power Supply...
Страница 50: ...Section 3 Local Operation User Diagnostics 48 Operating Manual for XPD Series Power Supply...
Страница 54: ...Section 4 Remote Operation Status Flags 52 Operating Manual for XPD Series Power Supply...
Страница 55: ......