Prosine 2.5/3.0 Installation & Operation Guide
17
Section 2: Controls and Indicators
Charger Information Menu
The Charger menu displays the charging status and enables you to determine if an equalization request
is enabled. A charger override request is also available at this menu.
See
“Section 6: Multistage Charging”
(
) for a detailed description of the charging regime, and
a discussion of equalization in general. See
“ACS Configuration‚” on page 28
for detailed instructions
on setting configuration parameters using the ACS panel.
See
“ACS Configuration‚” on page 28
for details on the Equalization Request and Override Charger
Operating Mode procedure.
Table 1:
Charger Status
STAGE
DESCRIPTION
Not Charging
Charger has been disabled or is on standby.
Bulk Charging
The first phase of the three-phase charging cycle has started.
Absorption Charging
Bulk charging has completed and the second phase of the
charging cycle has begun.
Float Charging
Absorption charging has completed and the charger is
‘topping-off’ and maintaining the batteries.
Equalization
The charger has started the special “equalization” stage.
CHARGER
STATE:
CHARGER STATE
OF
OVERRIDE
CHARGER
SELECT FROM:
CHARGER
EQUALIZE IS
NOW:
ENTER
EQUALIZE IS
NOW:
ENTER
Содержание Prosine PS2.5 and
Страница 1: ...Xantrex ProsineTM 2 5 and 3 0 Inverter Chargers Installation and Operation Guide PS2 5 PS3 0...
Страница 2: ...ProsineTM PS2 5 Inverter Charger PS3 0 Inverter Charger Installation and Operation Guide...
Страница 9: ...vi Prosine 2 5 3 0 Installation Operation Guide Figure 1 Inverter Charger Components...
Страница 13: ...Return Procedure x Prosine 2 5 3 0 Installation Operation Guide...
Страница 21: ...Inverter Features 4 Prosine 2 5 3 0 Installation Operation Guide...
Страница 41: ...Battery Temperature Sensor 24 Prosine 2 5 3 0 Installation Operation Guide...
Страница 75: ...Operating Limits for Inverter Operation 58 Prosine 2 5 3 0 Installation Operation Guide...
Страница 83: ...Operating Limits for Charger Operation 66 Prosine 2 5 3 0 Installation Operation Guide...
Страница 95: ...Cabling Hook up Configurations 78 Prosine 2 5 3 0 Installation Operation Guide...
Страница 98: ...Prosine 2 5 3 0 Installation Operation Guide 81 Appendix A Specifications Prosine 2 5 3 0 Chassis Dimensions...
Страница 99: ...82 Prosine 2 5 3 0 Installation Operation Guide Prosine 2 5 3 0 Chassis Dimensions with Brackets...
Страница 101: ...84 Prosine 2 5 3 0 Installation Operation Guide...
Страница 111: ...Error Code Table 94 Prosine 2 5 3 0 Installation Operation Guide...