Prosine 2.5/3.0 Installation & Operation Guide
7
Section 2: Controls and Indicators
Standard LED Control Panel
The Prosine inverter/charger is supplied with a control panel that can be mounted into an instrument
panel, bulkhead or wall. The standard control panel is used to report information about Prosine
operating parameters and the external AC and DC power sources connected to it. The standard control
panel has five separate functional divisions: the Battery Status LED display, the Faults Display and
Reset Button, the Inverter Status Indicator and On/Off Control Button, the Shorepower Indicator, and
the Charger Status Display and On/Off Control. These functional divisions are shown in the following
illustration.
Figure 3.
Standard LED Control Panel Display
Содержание Prosine PS2.5 and
Страница 1: ...Xantrex ProsineTM 2 5 and 3 0 Inverter Chargers Installation and Operation Guide PS2 5 PS3 0...
Страница 2: ...ProsineTM PS2 5 Inverter Charger PS3 0 Inverter Charger Installation and Operation Guide...
Страница 9: ...vi Prosine 2 5 3 0 Installation Operation Guide Figure 1 Inverter Charger Components...
Страница 13: ...Return Procedure x Prosine 2 5 3 0 Installation Operation Guide...
Страница 21: ...Inverter Features 4 Prosine 2 5 3 0 Installation Operation Guide...
Страница 41: ...Battery Temperature Sensor 24 Prosine 2 5 3 0 Installation Operation Guide...
Страница 75: ...Operating Limits for Inverter Operation 58 Prosine 2 5 3 0 Installation Operation Guide...
Страница 83: ...Operating Limits for Charger Operation 66 Prosine 2 5 3 0 Installation Operation Guide...
Страница 95: ...Cabling Hook up Configurations 78 Prosine 2 5 3 0 Installation Operation Guide...
Страница 98: ...Prosine 2 5 3 0 Installation Operation Guide 81 Appendix A Specifications Prosine 2 5 3 0 Chassis Dimensions...
Страница 99: ...82 Prosine 2 5 3 0 Installation Operation Guide Prosine 2 5 3 0 Chassis Dimensions with Brackets...
Страница 101: ...84 Prosine 2 5 3 0 Installation Operation Guide...
Страница 111: ...Error Code Table 94 Prosine 2 5 3 0 Installation Operation Guide...