A
absorption charge
B–3
AC knockout
illustrated
1–9
locations of
1–7
AC reconnect summary
B–6
AC wiring compartment access panel
1–7
AGM (absorbed glass mat) batteries
B–2
B
batteries
AGM (absorbed glass mat)
B–2
custom
B–2
flooded
B–2
gel
B–2
wet
B–2
battery damage, risk of
B–2
battery temperature sensor
charger operation
2–17
features
1–11
illustrated
1–11
battery temperature sensor jack, described
1–9
battery types, description of
B–2
bolt size
DC terminal
A–5
ground terminal
A–5
bulk charge
B–3
C
charge algorithm definitions
B–5
charge algorithm graph
B–5
charge algorithm stages
three-stage
B–2
two-stage
B–4
charger mode
A–6
charger operation, operating limits
2–22
charging
battery temperature sensor
1–4
built-in charge formulas
1–4
dead battery
1–4
described
1–3
equalization
1–4
load management
1–4
charging formulas. See charging algorithms.
B–2
configurable settings, how to select and adjust
3–5
configuration sub-menus
3–17
configure MS2000 menu
advanced
3–17
basic
3–10
Customer Service
v
fax number
v
phone number
1–v
preparing to call
WA–4
D
DC terminals
bolt size
A–5
covers
1–11
described
1–9
negative
1–9
positive
1–9
dead battery charging
1–4
derate, defined
A–6
Down arrow button
2–4
dual network jacks, described
1–9
E
Echo Charger
definition
C–2
testing
2–5
electronic protection
1–6
Enter button
2–3
equalization
precharging
2–20
procedure
2–18, 2–19
recommended frequency
2–18
terminating
2–22
equalization charge
B–4
Ethernet incompatability
1–9
F
fan
bottom
1–7
operation
A–5
top fan
1–7
fault
Index
Содержание MS2000
Страница 1: ...MS2000 Sine Wave Inverter Charger Operation Guide MS2000 ...
Страница 2: ......
Страница 3: ...MS2000 Sine Wave Inverter Charger Operation Guide ...
Страница 8: ...vi ...
Страница 18: ...xvi ...
Страница 28: ...Introduction 1 10 975 0125 02 01 Figure 1 5 DC Grounding Completed ...
Страница 111: ...C Terminology This section provides a glossary of terms and a listing of abbreviations used in this guide ...
Страница 124: ...IX 4 ...
Страница 125: ......