Configuration
3–4
152602
3. Click Send Configuration
4. Verify that the Present Inverter Data has the unit set as the Configured
Slave unit.
Refer to the GUI Help menu for complete configuration instructions.
Important:
If the inverter's date (not the workstation's!) is odd then the
Inverter is OPERATIONAL SLAVE until midnight; if the date is even, the
Inverter is OPERATIONAL MASTER until midnight.
CAUTION
The Master/Slave configuration will only be activated after power is cycled on
the unit.
Important:
Verify that the date is the same on both the GT100E #1 and
GT100E #2. This will allow the daily role reversal option to function correctly.
Содержание GT100E
Страница 1: ...GT100E MS Combiner Box for Master Slave Configuration Owner s Manual ...
Страница 2: ......
Страница 3: ...GT100E MS Combiner Box for Master Slave Configuration Owner s Manual ...
Страница 8: ...vi ...
Страница 10: ...viii ...
Страница 12: ...x ...
Страница 17: ...2 Installation Chapter 2 contains procedures on how to mount the GT100E MS and make the cable connections ...
Страница 31: ...3 Configuration Chapter 3 describes how to configure the GT100E MS for Master Slave configuration ...
Страница 38: ...WA 4 ...
Страница 39: ......