Configuration
3–2
152602
Master/Slave Configuration
The Master/Slave system can be configured through the Xantrex Solar
GUI (Graphical User Interface) software, P/N 1-152577-01, or through
the Operator Interface Panel.
Establish remote or local communication with the GT100E, using the
Xantrex Solar GUI software.
To set a unit up as the Master Unit:
1. Click Tools > Inverter Data > Operational Configuration
2. Check the Configured Master check box
3. Click Send Configuration
4. Verify that the Present Inverter Data has the unit set as the Configured
Master unit.
Important:
If the inverter's date (not the workstation's!) is odd then the
Inverter is OPERATIONAL MASTER until midnight; if the inverter's date is
even, the Inverter is OPERATIONAL SLAVE until midnight.
Содержание GT100E
Страница 1: ...GT100E MS Combiner Box for Master Slave Configuration Owner s Manual ...
Страница 2: ......
Страница 3: ...GT100E MS Combiner Box for Master Slave Configuration Owner s Manual ...
Страница 8: ...vi ...
Страница 10: ...viii ...
Страница 12: ...x ...
Страница 17: ...2 Installation Chapter 2 contains procedures on how to mount the GT100E MS and make the cable connections ...
Страница 31: ...3 Configuration Chapter 3 describes how to configure the GT100E MS for Master Slave configuration ...
Страница 38: ...WA 4 ...
Страница 39: ......