18
Freedom SW 230V Installation Guide
Installing the Inverter/Charger
Overview
This section provides detailed information on installing the
Freedom SW 230V. The overall procedure is divided into
eight steps:
Step 1: Choosing a Location for the Inverter/Charger on page 19,
Step 2: Mounting the Inverter/Charger on page 21,
Step 3: Connecting the AC Input and AC Output Wires on page 25,
Step 4: Connecting the DC Cables on page 29,
Step 5: Connecting the Battery Temperature Sensor (BTS) on
page 35,
Step 6: Connecting to the Network on page 39,
Step 7: Performing Checks Prior to Initial Start-Up on page 40, and
Step 8: Testing Your Installation on page 41.
FSW 230V Installation Guide.book Page 18 Tuesday, August 7, 2018 9:18 AM