background image

Installation manual for Indian FTR 1200 S from model year 2019

 

 

• Revision: 00 • 11/12/2019 • 

© ABM Fahrzeugtechnik GmbH 

Page 4 of 4

 

 

 

All wires must be laid in a manner which prevents them from bending or getting pulled during spring 
deflection movements and which adequately protects them against rubbing.  

 

After completing the work, check that all components and screws are tight and functioning correctly. Also 
check the rear wheel's freewheel and the functionality of the brake system. 

 

Afterwards, a test drive must be done! After completing the test drive, the tightness of all screw connections 
must be checked, as well as the adequate freedom of access of all moving parts. Re-test the rear wheel's 
freewheel and check the brake system for overheating. 

Final check

 

Отзывы: