Option 3
Installation Conditions: Mounting hole (ceiling) cannot be drilled on the ceiling, and
power line cannot be pulled out of wall, but can be pulled out of the side.
Installation List: Detector Body, Base (ceiling), Expansion Pipe, Self-tapping screw.
Step 1: Remove torsional spring from base (ceiling). Mark the hole on the wall &
ceiling, then punch with electrical drill (Ф4mm), finally put 2 pieces of expansion pipe
into the hole. Pull power line out of original gap of torsional spring, fix base at the wall
& ceiling with self-tapping screw.
Original Gap of Torsional Spring
10
Notes: Make a aperture of 5mm by drill(φ 4mm). Center distance of two pretargeting
aperture is 53.5mm.
Содержание WG-ZRPCNPW-G22-01
Страница 1: ...2015 2015 0616 V01 ISO9001 2008...
Страница 2: ...APP APP www wulian cc...
Страница 3: ...1...
Страница 4: ...IEEE 802 15 4 ZigBee SmartRoom 2...
Страница 5: ...http www wulian cc service shtml APP 3...
Страница 6: ...68mm 80mm 4...
Страница 7: ...5...
Страница 8: ...6...
Страница 9: ...7 39 6mm 5mm 4mm...
Страница 10: ...8...
Страница 11: ...9...
Страница 12: ...4mm 10 53 5mm 5mm 4mm...
Страница 13: ...11...
Страница 14: ...1 12...
Страница 15: ...2 4 1 ZigBee 13...
Страница 16: ...3 10 4 ZigBee 14...
Страница 17: ...mm g IEEE 802 15 4 ZigBee SmartRoom PCB AC 110 240V 100 PC 98 46 105 3 UL94 V 0 10 45 95 RH 15...
Страница 18: ...WG ZRPCNPW G22 01 PC WGPN140430001 16...
Страница 19: ......
Страница 20: ...15 11 210039 400 928 9288 www wulian cc...
Страница 23: ...Product Illustration Function Key Indicator Power Socket Front Side of Main Body Back Side of Main Body 1...
Страница 27: ...Step 2 Connect with power line 5...
Страница 28: ...Step 3 Pull up torsional spring and then tuck power line in the mounting hole to finish 6...
Страница 30: ...Step 2 Connect with power line 8...
Страница 31: ...Step 3 Attach main body to the base rotate clockwise to finish installation 9...
Страница 39: ......